Calculate npv for both conveyor belt systems

Assignment Help Financial Management
Reference no: EM132042399

Hagar Industrial Systems Company (HISC) is trying to decide between two different conveyor belt systems. System A costs $208,000, has a four-year life, and requires $67,000 in pretax annual operating costs. System B costs $294,000, has a six-year life, and requires $61,000 in pretax annual operating costs. Both systems are to be depreciated straight-line to zero over their lives and will have zero salvage value. Whichever system is chosen, it will not be replaced when it wears out. The tax rate is 34 percent and the discount rate is 8 percent.

Calculate the NPV for both conveyor belt systems. (Do not round intermediate calculations and round your answer to 2 decimal places, e.g., 32.16. A negative answer should be indicated by a minus sign.)

                       NPV

System A         $

System B         

Which system should the firm choose?

System A

System B

Reference no: EM132042399

Questions Cloud

Equally weighted portfolio of domestic equities : A foundation holds an equally weighted portfolio of domestic equities, international equities, private equity, and inflation-protected bonds.
Compute the posterior probability that the bid : Compute the posterior probability that the bid will be successful given that a request for additional information has been received.
Overall level of satisfaction and to attract new customers : How that company could modify its business-level strategy to both increase your overall level of satisfaction and to attract new customers.
What is the probability of exactly 6 successful rfp : What is the probability of exactly 6 successful RFPs? What is the formula used
Calculate npv for both conveyor belt systems : Hagar Industrial Systems Company (HISC) is trying to decide between two different conveyor belt systems. Calculate the NPV for both conveyor belt systems.
Making a product or delivering a service : Prices should reflect the value that consumers are willing to pay versus Prices should primarily just reflect the cost involved in making a product or deliverin
First lot under contract a : Who should bear the cost of correcting the defective widgets delivered in the first lot under Contract A?
You need to estimate risk free rate and market risk premium : Estimate discount rate using CAPM (Please provide details on your estimation. You need to estimate risk free rate and market risk premium.
The wacc assumes that the components weights : What is the true initial cost figure Southern should use when evaluating its project? The WACC assumes that the components weights are based on:

Reviews

Write a Review

Financial Management Questions & Answers

  Calculate the percentage change from current sales level

To calculate the percentage change from a current sales level to an anticipated sales level one should _________:

  Expecting interest rates to increase

You are expecting interest rates to increase. You sell a T-bill futures contract when the quoted price was 94.23. When the position was closed out, the interest rates increased and the price was 92.56. Assuming the same information as number 3 except..

  Gain for the concerned parties through the swap deal

Is there any gain for the concerned parties through the swap deal?

  About the cost of equity

The Absolute Zero Co. just issued a dividend of $2.50 per share on its common stock. The company is expected to maintain a constant 5.2 percent growth rate in its dividends indefinitely. If the stock sells for $50 a share, what is the company’s cost ..

  Considering leasing new robotic milling control system

Your firm is considering leasing a new robotic milling control system. What is the maximum lease payment that you would be willing to make?

  What is the best estimate of these bonds remaining life

Expected interest rate Lloyd Corporation's 12% coupon rate, semiannual payment, $1,000 par value bonds, which mature in 25 years, are callable 6 years from today at $1,025. They sell at a price of $1,278.56, and the yield curve is flat. What is the b..

  Capital structure analysis-what is the firm wacc

Pettit Printing Company has a total market value of $100 million,What is the firm's WACC?

  Should linda use the solar power system

Alternatively, she can purchase from the power grid at 44 cents per 100 watt-hours per day. Should Linda use the solar power system?

  The interest rate on the loan with the compensating balance

How low would the interest rate on the loan with the compensating balance have to be for you to choose it?

  Present value of payoff-when product is brought to market

Ang Electronics, Inc., has developed a new DVDR. If the DVDR is successful, the present value of the payoff (when the product is brought to market) is $34.3 million. If the DVDR fails, the present value of the payoff is $12.3 million. Calculate the N..

  Decided to rent these facilities from a competitor instead

Parker & Stone, Inc., is looking at setting up a new manufacturing plant in South Park to produce garden tools. The company bought some land 7 years ago for $6 million in anticipation of using it as a warehouse and distribution site, but the company ..

  What is the internal rate of return or irr for the project

What is the internal rate of return or IRR for the project?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd