Reference no: EM13939125
SETTING STANDARDS, MATERIALS AND LABOR VARIANCES
Tom Belford and Tony Sorrentino own a small business devoted to kitchen and bath granite installations. Recently, building contractors have insisted on up-front bid prices for a house rather than the cost-plus system that Tom and Tony were used to. They worry because natural flaws in the granite make it impossible to tell in advance exactly how much granite will be used on a particular job. In addition, granite can be easily broken, meaning that Tom or Tony could ruin a slab and would need to start over with a new one. Sometimes the improperly cut pieces could be used for smaller installations, sometimes not. All their accounting is done by a local certified public accounting firm headed by Charlene Davenport. Charlene listened to their concerns and suggested that it might be time to implement tighter controls by setting up a standard costing system.
Charlene reviewed the invoices pertaining to a number of Tom and Tony's previous jobs to determine the average amount of granite and glue needed per square foot. She then updated prices on both materials to reflect current conditions. The standards she developed for one square foot of counter installed were as follows:
Granite, per square foot $50.00
Glue (10 oz. @ $0.15) 1.50
Direct labor hours:
Cutting labor (0.10 hr. @ $15) 1.50
Installation labor (0.25 hr. @ $25) 6.25
These standards assumed that one seamless counter requires one sink cut (the space into which the sink will fit) as well as cutting the counter to fit the space available.
Charlene tracked the actual costs incurred by Tom and Tony for granite installation for the next six months. She found that they completed 50 jobs with an average of 32 square feet of granite installed in each one. The following information on actual amounts used and cost was gathered:
Granite purchased and used (1,640 sq. ft.) $79,048 Glue purchased and used (16,000 oz.) $2,560 Actual hours cutting labor 180
Actual hours installation labor 390
The actual wage rate for cutting and installation labor remained unchanged from the standard rate.
Required:
1. Calculate the materials price variances and materials usage variances for granite and for glue for the past six months.
2. Calculate the labor rate variances and labor efficiency variances for cutting labor and for installation labor for the past six months.
3. Would it be worthwhile for Charlene to establish standards for atypical jobs (e.g., those with more than one sink cut or wider than normal)?
Diagrams and the equations that you used
: 1. Needs to write down all the assumptions that were made in the analysis. 2. Needs to assume that the arch is symmetrical and assume each member is linear instead of Curved to make the calculation very easy. 3. Free body diagrams and the equation..
|
Can you have an array of arrays
: What are the purposes of the following three functions? How would you use them in your programs? Hint: In relation to buffers.
|
What is public administration
: The three main branches of political science are political theory, public law, which covers constitutional, administrative and international law, and public administration.
|
What are the diagrams defined in the uml standard
: What are the diagrams defined in the UML Standard. Give a one or two sentence description of each one. Given the following code, how should the toString methods in the classes H2ClassA and H2ClassB be written to give the indicated output and take a..
|
Calculate labor rate variances and labor efficiency variance
: Calculate the labor rate variances and labor efficiency variances for cutting labor and for installation labor for the past six months.
|
What was the market reaction to the self reported
: What was the market's reaction to the self-reported earnings announcement?
|
Two point charges are located on the x-axis
: Two point charges are located on the x-axis. One has a charge of 1.15 μC and is located at x = 0.0 m, and the other has a charge of -4.07 μC and is located at x = 11.7 m. At what location on the x-axis (other than at infinity) would the electric forc..
|
Calculate the labor efficiency variance for servicing
: Given the per-unit labor standard set, would you expect a favorable or an unfavorable labor efficiency? Explain. Calculate the labor efficiency variance for servicing the first 320 units.
|
What is the voltage in the circuit at that moment
: A capacitor of capacitance c=60 uf is connected in series with a resistance R=500 ohm and voltage g=10 v. (a) when does the capicator reach 20% of its maximum charge? (b) what is the voltage in the circuit at that moment? (Start from the loop equatio..
|