The Woods Enterprises prepared the following standard costs for the production of one stuffed bear:
Direct materials 1.5 pounds of stuffing @ $2 per lb
Direct labor 2 hours of assembly @ $15 per hr
Actual production costs for the production of 1,000 stuffed bears required 1,750 pounds of stuffing at a cost of $1.95 per pound and 1,950 labor hours at $15.25 per hour.
Question A.) Calculate the direct material price variance.
Question B.) Calculate the direct material usage variance.
Question c) calculate the direct labor rate variance
Question d) calculate the direct labor efficiency variance
What concept must be considered when looking at cash flows over several years for a long-term investment. Provide the suitable example.
If the income tax rate is 20% and the amount of income taxes paid would be $290 greater if the LIFO assumption were used
Pettit Company reports net income of $90,000in 2014. However, ending inventory was understated $7,000. What is the correct net income for 2014?
Determine whether there is over or underapplied overhead.Activities and information for May Raw materials purchases (paid with cash) 220,000
Find and Calculate the predetermined overhead rates per machine hour based on practical capacity, normal capacity and budgeted capacity respectively.
labeau products ltd. of perth australia has 35000 to invest the company is trying to decide between two alternative
Which alternative is more desirable for Shenk and by what amount?Shenk Company needs 20,000 components for a product it manufactures.
Can you discuss the life-cycle cost management and the role of target costing? What are the three cost reduction methods? Example.
Do you agree with the president? Why or why not? Explain your point - Where were costs in line and where were they out of line?
What is the NPV of each project? Assume neither project has a residual value. Round to two decimal places. What is the maximum acceptable price to pay for each
A return on investment of 16%, an asset turnover of 6, and income of $190,000. on the basis of this information, the company's invested capital was.
ABF company is considering to adopt activity based costing. While analyzing costs at different levels which are examples of batch level activities
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd