Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Consider a cantilever beam that is 10 ft long and supports a concentrated load of 833 lbs at its free end. Assume the beam is 2" x 10" in cross section. Calculate the bending stress distribution that is present at the base of the cantilever and at every 2.5 ft increment toward the free end of the beam ( total of five locations). Indicate numerical values for max. Bending stress at each section. Do a similar excersize for shear stresses at each section.
Activity Description Duration Immediate Predecessors ST Start milestone - Activity Description duration Inmdiate predesesor ST Start milestone - - A excavate st. 1 4 ST B Order & steel del. work 7 ST C Formwork st.
a silty material is to be used to fill an earth damn. How much water must be added to bring the water content of each ton (2000 lb) of the material to 35% if the original watter content is 11.4%
H = h - N Point B has a geoid correction of -100', and a NAVD88 elevation of 100'. What is the point B ellipse height
If 0.100 mol each of SO2 and NO2 are placed in a 500 mL vessel at this temperature, what are the concentrations of the reactants and products when equilibrium is established for this reaction?
A 30mm pipe X 460 mm rectangular duct carries air. What size square conduit is needed to transport 4m cube per sec of water at a distance of 45m and head loss of of 1.08m.
You are going to assemble 1,000 bolt + hole combinations. The bolts have a mean diameter of 1.000 cm, normally distributed with standard deviation of 0.010 cm. The holes have a mean diameter of 1.030 cm, normally distributed with standard deviatio..
Assuming that the CPI (82-84) for March 2013 is 232.773, and your starting salary is $55,000. How much would your starting salary have been in 1983 (assume CPI=100).
a vertical curve on this highway connects +1% and +3% grade and is 420ft long. if a horizontal curve on highway is on a two-lane section with 12 ft lanes and has a central angle of 37 degrees and a superelevation of 6%, what is the length of the h..
Of this total, 2000 acres are residential(CN=68), 500 acres are industrial (CN=88), and 2500 acres are forest with good cover (CN=55). For a design storm of with a total precipitation of 7 inches, estimate the direct runoff in inches.
Important information about Mechanical engineering dynamics, A 3000 lb car rests on a horizontal street out of gas with its brakes locked.
Drawdown at a 0.20 m diameter, fully penetrating well, which has been pumping at the rate of 1000 m^3/day for a long enough time that steady state conditions have been reached, is determined to be 0.70 m.
Data from service records show that the time to repair a certain machine is normally distrubuted with a mean of 65 min and a standard deviation of 5 min. Estimate how often it will take more than 75 min to repair a machine.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd