Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Question: A very large mining operation has decided to control the inventory of high-pressure piping by a "periodic review, order up to M" policy, where M is a target level. The annual demand for this piping is normally distributed, with mean 600 and variance 800. This demand occurs fairly uniformly over the year. The lead time for resupply is Erlang distributed of order k = 2 with its mean at 2 months. The cost of each unit is $400. The inventory carrying charge, as a proportion of item cost on an annual basis, is expected to fluctuate normally about the mean 0.25 (simple interest), with a standard deviation of 0.01. The cost of making a review and placing an order is $200, and the cost of a backorder is estimated to be $100 per unit backordered. Suppose that the inventory level is reviewed every 2 months, and let M = 337.
(a) Make five independent replications, each of run length 100 months, to estimate long-run mean monthly cost by means of a 90% confidence interval:
(b) Investigate the effects of initial conditions. Calculate an appropriate number of monthly observations to delete to reduce initialization bias to a negligible level.
Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.
This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.
This assignment has questions related to probabiltiy.
Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.
Derive the Boolean Expression and construct the switching circuit for the truth table stated
Evaluate which equations are under-identified, just-identified, and over-identified.
Linear programming problem consisting of only two constraints with one objective function.
Find the natural domain of the given functions.
Compute the coecients of the polynomials using the term recurrence relation.
De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.
Questions related on mathematics in computing.
Complex problems
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd