1. The two different approaches to load work centers in job-shop scheduling are

load charts and schedule charts.

Gantt charts and assignment method.

infinite loading and finite loading.

linear programming and makespan.

None of the above

2. The priority rule where jobs are processed according to the smallest ratio of due date to processing time is

CR.

EEDD.

FCFS.

S/O.

SPT.

3. A scheduling rule used for sequencing jobs through two work centers is

the critical ratio rule.

the Johnson's rule.

the slack per operation rule.

the shortest processing time rule.

the Pareto rule.

4. The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:
Job Processing Time (hrs) Due (hrs from now)

W 4 4

X 3 5

Y 2 2

Z 1 1

If he uses the first-come, first-served (FCFS) priority rule to schedule these jobs, what will be the average completion time?

7.5 hours

5 hours

3 hours

2.5 hours

2 hours

5. The ultimate goal of JIT operations is to have

no in-process inventories.

cross-trained workers capable of handling every process.

a smooth, rapid flow of materials through the system.

no setup times.

All of the above

6. Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of delayed differentiation.

kanban.

autonomation.

andon.

matrix management.

7. A kanban card is used to signal that

work is needed at the work center.

work is ready to be moved to the next station.

a worker has run out of parts needed for further processing.

a machine has broken down and needs immediate attention.

a machine is ready for preventive maintenance.

8. The type of processing system that is used for highly standardized products is

continuous.

intermittent.

project.

batch.

unit.

1. The priority rule, which will sequence jobs in the order they are received, is _____.

EDD

LIFO

SPT

CR

FCFS

2. In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse?

0 hours

1 hour

2 hours

3 hours

4 hours

3. A major difference between manufacturing and service systems in terms of scheduling is

variability in arrival and service rates.

processing cost per unit.

the number of units to be processed.

length of processing time.

output rate.

4. Scheduling in service systems may involve scheduling which of the following?

The workforce

The equipment

A and B

Customers

All of the above

5. The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:
Job Processing Time (hrs) Due (hrs from now)

W 4 4

X 3 5

Y 2 2

Z 1 1

If he uses the earliest due date first (EDD) priority rule to schedule these jobs, what will be the average job tardiness?

0 hours

1.5 hours

1.75 hours

2 hours

2.25 hours

6. Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of

delayed differentiation.

kanban.

autonomation.

andon.

matrix management.

7. With regard to suppliers, JIT systems typically require

delivery of large lots at regular intervals.

buyer inspection of goods and materials.

multiple sources from which to purchase.

long-term relationships and commitments.

the lowest price possible.

8. Which of the following is characteristic of the JIT philosophy?

Inventories are an asset.

Lot sizes are optimized by formula.

Vendors are co-workers, essentially other departments of our organization.

Queues are a necessary investment.

All of the above

9. In make-to-stock systems, fluctuations in sales volume are managed through which of the following?

Order backlog

Finished goods inventory

WIP or FG inventory

All of the above

None of the above

10. In an MRP master schedule, the planning horizon is often separated into a series of times periods called pegging.

lead times.

stacked lead times.

time buckets.

firm, fixed, and frozen.

1.Does cellular manufacturing apply best to repetitive, high-volume product or nonrepetitive, low-volume product? Explain and give an example.

2. Validate or invalidate the statement that although inventories are maintained, the goal of lean operations is to maintain a minimum of safety stock.

3. Elaborate on the statement: "The output of the system cannot exceed the output of the bottleneck operation(s)."

4. Differentiate between infinite loading and finite loading as two major approaches used to load work centers.

5. Explain why batch process helps maximize worker efficiency.

6. Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival):
Job Processing Time (days) Due Date (days from now)

A 2 2

B 5 6

C 6 10

D 3 4

E 4 8

What is the schedule sequence using the first-come, first-served (FCFS) priority rule?

7. Respond to the question: "Which is better, MRP or JIT?"

8. The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to a make-to-stock system and explain the rationale.

9. Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, and product volume per period, product mix changes, and delivery schedule changes.

10. Manufacturing strategy also drives the choice of shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice.

1. Explain how cellular manufacturing represents a flexible manufacturing system.

2. State the four building blocks of lean operations, and explain how fast and simple are the two common threads that run through them.

3. Elaborate on the statement: "The output of the system cannot exceed the output of the bottleneck operation(s).

4. Differentiate between infinite loading and finite loading as two major approaches used to load work centers.

5. The theory of constraints has a goal of maximizing flow through the entire system.

6. Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival):
Job Processing Time (days) Due Date (days from now)

A 2 2

B 5 6

C 6 10

D 3 4

E 4 8

What is the average completion time for the first-come, first-served (FCFS) priority rule schedule? Average job tardiness? Average number of jobs at the center?

7. Respond to the question: "Which is better, MRP or JIT?

8. The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to an assemble-to-order system and explain the rationale.

9. Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, product volume per period, product mix changes, and delivery schedule changes.

10. Manufacturing strategy also drives the choice of shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice.

Reference no: EM13738114

Questions Cloud

Understand phase : The Understand phase allows the members of the BPM team to gain understanding of the current business processes. It is critical to have quantifiable targets for the project and this will be accomplished through a detailed analysis of the processes..
Discuss how the initiative device affects state politics : Describe key structures, powers, and procedures that are commonly found in most state constitutions in the US. Using examples from your textbook, discuss how the initiative device affects state politics.
Proposed business process changes for the system : A description of any proposed business process changes for the system along with flow diagrams A specific discussion on any Internet and mobile access components of the system
Describes the process the company uses to build its brand : Select a company with which you are familiar. Write a paper of no more than 700 word that describes the process the company uses to build its brand
Building up an inventory of standard parts or modules : Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of delayed differentiation.
Improvement and evaluation : Assign a grade to your current or former employer's HR function. Provide a justification for the grade. Then, analyze two improvements that could be implemented quickly (within 3 months' time) that would raise the grade you assigned.
Prepare a schedule of expected cash collections for april : 1. Prepare a schedule of expected cash collections for April, May, and June, and for the three months in total.2. Prepare a cash budget, by month and in total, for the three-month period.3. If the company needs a minimum cash balance of $20,000 to st..
What is the executional style used in each ad : The goal of this assignment is to look at how advertising can be used to create different positions for products in the same product category. What is the executional style used in each ad
Managerial decision making : Take a position on whether or not managerial groups within a large organization are more likely to make better decisions than individual managers within the same organization. Provide support for your position.

Reviews

Write a Review

Operation Management Questions & Answers

  Discuss the advantages of the using groups to make decisions

The CEO of your organization has developed two potential plans to help the organization cut costs. The CEO has asked you to form a group; the members of the group are to represent a cross-section of all the departments within the organization.

  Describe the difference between standard deviation and

explain the difference between standard deviation and quartiles and percentiles. please provide examples.be sure to

  Determine the cost of the chiefs plan

Evaluate the current staffing plan. What does it cost? Are 26 officers sufficient to handle the normal workload? Determine the cost of the Chiefs plan. Do you need to implement the Chief's plan or can the current staff handle the load? Explain your ..

  What is the probability that the waiting line is empty

A waiting line meeting the M/M/1 assumptions has an arrival rate of 5 per hour and a service rate of 13 per hour.

  Case study - operation of worldwide chemical company

Jack Smith wiped the perspiration from his face. It was another scorching-hot summer day, and one of the four process refrigeration units was down.

  Calculate the total cost

The Cody City Chamber of Commerce periodically sponsors public service seminars and programs which are open to the public. Currently, promotional plans are under way for this year's program.

  What is the possible daily output of this process

What is the possible daily output of this "process" if 8 hours of processing time is available each day? b. Given your output rate in part a, what is the efficiency of the process?

  A member of a one culture might not view a situation with

a member of a one culture may not view a situation with the same ethical perspective as a member of another culture.

  Create a vb program that allows the user to manage

create a VB program that allows the user to manage vehicle information including License plate number, owner name, owner phone number

  Describe the information systems that a typical restaurant

describe the information systems that a typical restaurant might use and the tasks these systems perform. how might

  Proposed organization development interventions

his will require a practitioner analysis of the organizational problem of interest and an academic literature review of similar organizational problems and organizational development strategy (ies) that you believe will be most beneficial in solvi..

  Which of the given types of organizational structure would

1 as a manager you want to create a project team to plan and implement a project designed to meet the demands of

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd