Building services design project targeted outcomes

Assignment Help Other Engineering
Reference no: EM131764199 , Length: 10

BIM in Building Services Design Project Targeted Outcomes

This assessment is designed to assess students' achievement of the following Intended Learning Outcomes (ILOs):

1. Establish building services systems on existing building model;

2. Apply BIM software in simulation, calculation and presentation of HVAC system design;

3. Apply BIM software in calculation and presentation of electrical services and plumbing design;

4. Synthesis and coordinate combined services systems by BIM software

Guidelines/Requirements

Each group of students (3 or 4 students) should design the building services systems of one floor (3/F) of a proposed office building in Hong Kong. Each group should submit a written report to cover the work done in a specific building services systems project design with BIM.

The following building services systems should be included in the BIM model:

- Lighting system (including lux level calculation by BIM)
- HVAC air side system (including cooling load analysis and duct sizing by BIM)
- sprinkler system
- necessary plumbing pipework

Submission

Both hardcopy of report and softcopy of BIM files (including the file of linked model) in CD rom should be submitted.

Design Report
The report should be in max. 10 pages excluding appendices. Individual input with rough percentage contributions in the project might be included in the cover page if appropriate. The following contents are suggested for the design report (but not exhaustive):

a. Introduction

b. Background information - e.g. location, usage, tenants, building type, etc.

c. Design criteria - e.g. in/outdoor design conditions, fresh air requirements, design lux level, sprinkler OH type, etc.

d. Summary table of simulation Results
- Lux level
- Cooling load analysis
- Duct sizing analysis

e. Description of the different BS systems - e.g. system selection, design consideration, description, etc.

f. Coordination of BS systems
- Arrangement of different BS systems
- Solving design conflict (Detailed illustration of at least 3 cases of design conflicts and the respective solutions in both sectional and 3D drawings)

g. Conclusion

h. Appendix

i. Design drawings:
- Scaled layout plan drawings of different services
- Combined services drawings
- Sectional drawings in congested areas
- 3D drawing of BS systems.
ii. Simulation results
iii. Reference
iv. etc

Reference no: EM131764199

Questions Cloud

Discuss spending variances and activity variances : Prepare a flexible budget performance report showing AirQual Test Corporation's revenue and spending variances and activity variances
Percent of internet users neither download nor share music : Sharing music online (5.2) A sample survey reports that 29% of Internet users download music files online, 21% share music files from their computers.
How does each religion respond to the problems of evil : Which way of addressing evil is the most similar to your own? What role does reason play in your personal understanding of evil?
Discuss the profitability of the shaker run golf club : Prepare an action analysis report showing the profitability of the Shaker Run Golf Club. Include direct materials and direct labor hour costs in the report
Building services design project targeted outcomes : MBS4246 - Establish building services systems on existing building model and Apply BIM software in simulation-calculation and presentation of HVAC system design
The nature of the concert requirements : The nature of the concert requirements and accompanying reports is expose students to musical experiences to which they are for the most part unfamiliar.
Calculate the mean play time of the songs : Songs on an iPod David's iPod has about 10,000 songs. The distribution of the play times for these songs is heavily skewed to the right with a mean of 225.
Construct a health policy and analysis : This topic may address a needed change in technology, health care literacy, staffing, billing, diagnosis, etc.
Creating a business opportunity : Module Title: Entrepreneurship - Creating a Business Opportunity, Project: Turkish Restaurant in Middlesex Street. How often do you visit restaurants

Reviews

len1764199

12/13/2017 6:50:34 AM

ASSESSMENT RUBIC Note: The following assessment rubic will be applied in general to various forms of assessment with the range of marks and criteria showing the relative performance in different levels. Range of Marks Criteria (Percentage)

len1764199

12/13/2017 6:49:45 AM

Course: Building Information Modeling Instruction: please see the attachment. 3D drawing must be drawn by Revit. Total 10 pages excluding content and appendixASSainlatt Crimrfa • Bevan contents description. consideration• analysis. use of local guidelines and standards (30%) • Application of RIM- cakulatioasimulation and model development (25%) • Quality and presentation of design drawings (20%) • Coordination of different building services - arrangement of services and solving of design conflicis (25%)

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd