Building properties and performance solutions

Assignment Help Civil Engineering
Reference no: EM133183461

Part Determine Construction Compliance Requirements

Identify Applicable National Construction Code (NCC) Performance Requirements

This task requires you to identify the performance requirements of chosen building properties and performance solutions for each performance requirement.

You must complete Task 1.1 first before proceeding with this task.

Steps to take:
1. Access and review the building project plans from Task 1.1.
2. Locate the Performance Solution Identification form provided for you on the following pages.
The Performance Solution Identification form includes questions related to the performance requirements of the building project plans you will need to answer.
Review the instructions here and in the Performance Solution Identification form with your supervisor before starting so you can prepare for the questions.
3. Using the Performance Solution Identification form, identify one performance requirement for each of the following building property of each building in the project plans:
i. Energy efficiency
ii. Services and equipment
iii. Fire protection
iv. Health and amenity
v. Structure
vi. Access and egress
vii. Ancillary provisions
4. For each performance requirement identified, identify the following:
i. One Deemed-to-Satisfy solution.
ii. One Performance Solution
5. Have your supervisor review your completed Performance Solution Identification form and complete and sign the Supervisor Declaration at the end. Their signature must be handwritten.

Reference no: EM133183461

Questions Cloud

What are the variable expenses per unit : Lindon Company is the exclusive distributor for an automotive product that sells for $52.00 per unit. What are the variable expenses per unit
Ethical issue involving business from a professional journal : Find a current event about a legal or ethical issue involving business from a professional journal (within the last 1 year) and brief it and discuss using the I
Determine the compliance of construction methods : Determine the compliance of construction methods in the project plans. Specifically, you must determine two criteria for each construction method
Calculate postretirement benefit expense : The actuaries of the Springfield manufacturing company reported the following information - Calculate postretirement benefit expense
Building properties and performance solutions : Identify the performance requirements of chosen building properties and performance solutions for each performance requirement
Determine the proportion of millennials : a. Develop hypothesis for a test to determine whether the proportion of millennials continuing to be dependent on their parents is higher than the past generati
Formulating a solution for under armour : Using VRIN resources, diversification, mergers and acquisitions, and international strategy what action plan might Under Armour implement to solve the company's
Why the building in the project plan is classified : Provide a brief explanation as to why the building in the project plan is classified with the subclass you have identified
What is a feasibility study relative to a business plan : Someone once said, "failure to plan is a plan to fail". How might this apply to run a business?

Reviews

Write a Review

Civil Engineering Questions & Answers

  What are the proper units for this coefficient

What model would more appro-priately describe the future behavior of this population?

  How the station has been designed to function efficiently

CEGE0003 - Civil Engineering Design - University College London - Civil Engineering Design Study - How the station has been designed to function efficiently

  How many yards of borrow is require to complete construction

an embarkment will be constructed with the soil compacted to 95 percent of the max dry density. the borrow material, is deposited at a uniform density of 75 percent of the max dry density. the roadway embankment will require 75,000 cubic yards of ..

  Flexural strength of concrete

a) A 6" x 6" cross section beam is tested and the break occurs 5.6 inches from one support. If P = 4920 lbs, compute R.

  Determine what would the deflection be at the right end

A 2-inch by 2-inch solid steel beam (18 inches long) is fixed to the wall at the left to resist applied moment (20,000 lbs-inch). What would the deflection be at the right end Up or down

  What is overturning factor of safety for building wind load

How many floors can be added to the building while maintaining the code required overturning factor of safety of 2.0 Assume the roof supports a wind load of 4 kips and all floors below support a wind load of 8 kips.

  Determine the horizontal components of the forces necessary

A 6 foot diameter pipleine carries water at a temperature at 60F at a steady flow rate of 60 cubic feet per second. The pipeline makes a 90 degree horizontal bend.

  For finding the elevation of point c the azimuth angle from

For finding the elevation of point C the Azimuth Angle from poit A to C is measured as 76deg ?15'00". The height of the instrument during this measurement was 1.60m

  Calculate whether the process is capable or not

calculate whether the process is capable or not.

  Determine the location e of the shear center for thin walled

Determine the location e of the shear center, pt. O, for the thin-walled member having the cross section shown. The member segments have the same thickness t.

  Determine modulus of elasticity of concrete by aci formula

Determine the Modulus of Elasticity of Concrete by the ACI formula for a concrete cylinder that has a unit weight of 120pcf (1920kg/m^3) and a compressive strength of 3000 psi (21MPa).

  What is the chlorine concentration when the tank is put back

A water tower containing 4000 m3 of water has been taken out of service to install a chlorine monitor. The concentration of chlorine in the water tower was 2.0 mg/L when the tower was taken out of service.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd