Broomfield company budgeted 7200000 of manufacturing

Assignment Help Accounting Basics
Reference no: EM13606400

Broomfield Company budgeted $7,200,000 of manufacturing overhead for the current year, and 50,000 hours of direct labor (cost of $60/hour). Production of Product X (100,000 units) consumed $200,000 of direct materials, and 8,000 direct labor hours.

Assume that Broomfield uses an ABC system, with three cost drivers: machine hours, materials handling, and setups. Of the total overhead cost, 55% is in the machine hour pool (40,000 budgeted hours), 25% is in the materials pool (allocated based on dollars of raw materials used ($1,600,000 total)), and 20% in the setup pool (100 budgeted setups). In addition to the materials and labor listed above, Product X used 5,500 machine hours and 14 setups. Compute the unit cost of Product X under the ABC system.

Reference no: EM13606400

Questions Cloud

The maximum compression of the springs is to be 2m : two equal-length springs are nested together in order to form a shock absorber. if it is designed to arrest the motion
A man with mass m 700 kg weight 1540 lbs is walking : a man with mass m 70.0 kg weight 154.0 lbs is walking towards a patio at 2.10 ms 4.70 mph when at the last moment he
Oxford plastic company case study 1 how does the : oxford plastic company case study1. how does the institutional environment and view come into play for oxford in this
A sailor in a small sailboat encounters shifting winds she : a sailor in a small sailboat encounters shifting winds. she sails 2.00 km east then 3.50 km southeast and then an
Broomfield company budgeted 7200000 of manufacturing : broomfield company budgeted 7200000 of manufacturing overhead for the current year and 50000 hours of direct labor cost
The inner and outer surfaces of a 6-m x 7-m brick wall of : the inner and outer surfaces of a 6-m x 7-m brick wall of thickness 41 cm and thermal conductivity .69 wmc are
Wilson company has a predetermined overhead rate of 70 of : wilson company has a predetermined overhead rate of 70 of direct labor cost. during the month 350000 of factory labor
El dorado company has two production plants recently the : el dorado company has two production plants. recently the company conducted an abm study to determine the cost of
Find the distance a traveled by the piston if w is the work : a cylinder of cross-sectional area a is divided inot tow chambers 1 and 2 by means of a frictionless piston. the piston

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd