Bridge pier on shallow foundation system

Assignment Help Civil Engineering
Reference no: EM132843983 , Length: 10 pages

PROJECT - Bridge Pier on Shallow Foundation System

You have been tasked to assist the structural engineer for a bridge replacement project. Your task is to design the size of the footing for a bridge pier, based on the allowable stress design method. A soil test boring was drilled at the location of the bridge pier. The soil test boring log has shown that the soil is fairly uniform at the pier location and consists of a layer of clay overlying a five-layer system of silty sand, well graded sand, uniform sand, sandy silt, and well-graded sand. Detailed information about each layer is given in the attached soil test boring log and in the table below. Groundwater table was encountered at the depth of 25 feet after a stabilization period during the subsurface exploration program. However, the groundwater table was observed to fluctuate at depths ranging from 22 to 27 feet below the ground surface during long term monitoring. Neglect correction factors for borehole diameter, sampler correction, and correction for rod length

The following information was provided by the structural engineer:
- Scour is not an issue at the site.
- Frost penetration depth is 4.5 feet.
- Tolerable settlement for the project is 1.5 inches.
- Axial Load - 1800 kips
- Shear Load at base of footing = 400 kips
- Moment about both axes- 1800 kips-ft
- Use Schmertmann's (1975) and Kulhawy and Mayne (1990) correlation between SPT and φ', and round to nearest degree.
- The increase in stress in each layer should be estimated using the 2:1 method
- Settlement analyses should be based on the Schmertmann's method.

Soil Type

gala

Silts, sandy silts, slightly cohesive silt-sand

2

Clean, tine to medium sands and silty sands & gravels

3.5

Fine to coarse sands and sands with little gravel

4

Sandy gravel and gavel

6

Depth

(ft)

 

Soil Description

Wet Unit Weight

(pcf)

Saturated Unit

Weight (pcf)

0.25 - 5.5

Lean CLAY

120.0

--

5.5 - 16

Silty SAND & GRAVEL

125.0

--

16 - 40

Well graded fine to coarse SAND

120.0

130.0

40 - 52

Uniform medium SAND

115.0

125.0

52-76

Sandy SILT

110.0

120.0

76-100

Well graded fine to coarse SAND

120.0

130.0

Using the information provided above, design the size of the footing for the interior bridge pier, based on the allowable stress design method. You should consider both settlement and bearing capacity, and check for overturning and sliding. You should provide the structural engineer with a formal typed report that will include all of your analyses and final size of the footing, including the thickness of the footing, reinforcement, and CAD drawing of the footing. You should also include all of your design assumptions in your report and explain why you chose that footing size.

Attachment:- CVL_PROJECT.rar

Reference no: EM132843983

Questions Cloud

What is the target selling price : What is the target selling price if costs cannot be reduced and target profit is changed to 20 percent of the new selling price
How you will obtain the information for the assessments : Plan how you will obtain the information for the assessments. Create a PowerPoint presentation no more than 10 slides addressing each area of the windshield.
How much would have to deposit today : How much would you have to deposit today? You would like to have $6,000 dollars in an account after three years' time. If the account earns 6% compounded.
How do calculate the value of the ending inventory : How do Calculate the value of the ending inventory and the value of the inventory used for the year using both the FIFO and LIFO methods.
Bridge pier on shallow foundation system : Bridge Pier on Shallow Foundation System - design the size of the footing for the interior bridge pier, based on the allowable stress design method
What annual interest rate must you earn : You need to have $32,800 in the account. What annual interest rate must you earn over the last 6 years to accomplish this goal
Describe protocol for medication administration : Describe protocol for medication administration and Protocol for infection control. Compare protocol for medication administration and protocol for infection.
Discuss the potential for including associated legal fees : Discuss the potential for including associated legal fees into the cost of acquiring RedCarpet using appropriate accounting standard
What the weaknesses relating to purchases and payments : The special ordering system functions, What the weaknesses relating to purchases and payments of "special orders" by the Diamond Manufacturing Company?

Reviews

len2843983

3/30/2021 12:54:36 AM

Your company had already helped me the with the first part of the attached document. I would like to work with you in regards to the underlined sentences on page two of the attached document. Please let me know at your earliest convenience. Thank you.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd