BPP3213 Estimating and Scheduling Assignment

Assignment Help Other Engineering
Reference no: EM133120654

BPP3213 Estimating and Scheduling - Muscat College

TOPICS: Time, Cost and resources Planning

Introduction

NOOR is a leading international construction company located in Ghala Industrial Area, Muscat, Oman. NOOR has extensive multi-disciplinary projects undertaken and has a very good reputation in construction industry, especially in commercial and residential development.

Recently, NOOR has secured another multi-disciplinary project with a total project cost of RO 10 million. The project is to establish a 5-star resort in Qurayyat. The client has briefly set out the requirements for the facility which will:

• Provide space for The Resort
• All facilities must be equipped with the latest facilities
• Provide sufficient community facilities
• Have high speed communication links to major database and stakeholders

Task Description

A number of sub-projects have been identified for the multi-disciplinary project. As a team, you are responsible to prepare a Gantt Chart, resource estimation and cost plan for the following sub-projects.

You are to prepare a draft of project plan comprising a and Gantt Chart, resource estimation and cost plan. This proposal is to be issued to the Project Control Committee of NOOR.

The Gantt Chart is to be prepared using Microsoft Project and should comprise between 20 to 30 activities. Clearly identify they key milestones, interdependencies with other sub-projects, the critical path, early dates and total float.

Your submission to the Project Control Committee should comprise the following:

i) Project description
ii) A letter to the client requesting approval for the Gantt Chart
iii) A Work Breakdown Structure (WBS)
iv) A Gantt Chart showing as a minimum: The critical path, early dates, total float, relationship between activities, key milestones, and resources
v) Resource estimation and cost
vi) Any key assumptions or allowances and constraints in your project.

To assist you with the task, an overall high level WBS has been provided by Project Control Committee and is included below:

TRANSPORT AND LOGISTICS
Prepare Logistics Plan Prepare Cost Plan
Prepare Contract Documentation Procure Transport Logistic Providers

HEALTH CLUB
Design health club Prepare Cost Plan Finalise Design Procure health club Construct health club Data Centre Complete

THE RESORT
Confirm the resort design Design the Resort Prepare Cost Plan
Prepare Contract Documentation Procure The Resort facilities Construct The Resort
The Resort Complete

UTILITY TUNNELS
Confirm Location of Tunnels Design Tunnels

Prepare Cost Plan Finalise Design Construct Tunnels Tunnels Complete

SITE INFRASTRUCTURE AND LANDSCAPE WORK
Confirm Site Infrastructure Requirements Design Landscape Work
Prepare Electrical Specifications Prepare Water Specifications Prepare Cost Plan
Submit Cost Plan
Finalise Site Infrastructure Specifications Finalise Landscape Work Design
Procure Site Infrastructure Plant & Equipment Procure Landscape Material
Deliver Site Infrastructure Plant & Equipment Deliver Landscape Material
Install Site Infrastructure Plant & Equipment Construct Landscape
Site Infrastructure Plant & Equipment and Landscape Work Complete

EXTERNAL COMMUNITY FACILITIES
Confirm Location of Facilities Design Facilities
Prepare Cost Plan Finalise Design Construct Facilities Facilities Complete

Following guidelines should be followed related to formatting of this assignment.

Font Style: Times New Roman
Font Size: 12
Line and Paragraph Spacing: 1.5
Margin: 1" (Top & Bottom), 1.17 (Left & Right) References: APA Referencing Style

Attachment:- Estimating and Scheduling.rar

Reference no: EM133120654

Questions Cloud

Differentiation focus or cost-focused strategy : Think of a firm that has attained a differentiation focus or a cost-focused strategy. Are its advantages sustainable? Why? Why not?
What are major trends in general environment : What are major trends in general environment? What is impact of these trends on the firm? What are the major sources can you identify to monitor these trends?
Prepare the statement of financial position of magin : Capital assets - fair value is $1,100,000 Patent - fair value is $200,000. Prepare the statement of financial position of Magin as at January 1, 2020
Developing good business relationship with customers : Explain the importance of developing good business relationship with customers.
BPP3213 Estimating and Scheduling Assignment : BPP3213 Estimating and Scheduling Assignment Help and Solution, Muscat College - Assessment Writing Service - Prepare a draft of project plan
Spruce paper company recently finished major project : A group of employees at Spruce Paper Company recently finished a major project that involved multiple departments, from creative to distribution
What are the term structure rates : Assuming annual coupon payments, what are the term structure rates for 1 year and 2 years?
What is the adjusted basis for the warehouse : The building cost $475,000. He took $247,000 of depreciation on building, and then sold it for $580,000 on July 1, 2020. What is adjusted basis for warehouse
Identifies healthcare organization : Identifies a healthcare organization in your state and the steps needed to assist the healthcare organization to begin working and performing efficiently.

Reviews

Write a Review

Other Engineering Questions & Answers

  What is code-warrior simulation result after moving the data

What is the Code-Warrior simulation result (showing register and memory contents from address $2000 to $202F) after moving the data?

  Designing data communications network

How can a network designer determine if they are important, and how are they taken into account when designing a data communications network?

  Failure from different sources such as reports

Select a recent system failure, preferably a marine one, that has attracted your interest. Collect information relating to the failure from different sources such as reports, statements, newspapers, magazines or journals. Include these sources wit..

  Write essay on solar powered motor boat

This question in Engineering is about an essay on Solar Powered Motor Boat. In the recent times due to increase in pollution as well as increasing cost of fossil fuels are forcing engineers and scientists look for alternative and sustainable sourc..

  Explain how the priority is determined

Show how the arbitration logic of Fig. can be modified to provide a rotating daisy chain arbitration procedure. Explain how the priority is determined.

  Discuss several steps in information risks planning

Describe how you will use each step. Will you need to use all the steps, if not what steps would be eliminated?several steps in Information Risks planning

  Discuss the value of risk analysis

Discuss the value of risk analysis and how the process can be used to derive project management decisions under conditions of uncertainty

  Different types of shift registers and their applications

For this discussion, you have to do your Internet research on the different types of shift registers and their applications. Select one particular type of shift register and write a 300 word note describing your findings.

  Compute volume fraction as a function of the fiber diameter

Compute the volume fraction Vf as a function of the fiber diameter df and the spacing between the centers of the fibers ax and ay in the two directions (center to center).

  Compare open-loop and closed-loop control systems

Industrial Systems Assignment - GRACO. Compare open-loop and closed-loop control systems. Give an example of both systems

  What is information security governance

What is Information Security Governance? What are some of the common organizational roles involved in Security Governance?

  Find the value of zl in the circuit

Find the value of ZL in the circuit of Fig. for maximum power transfer.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd