Bolts are tested in batches or lots a specified number are

Assignment Help Mechanical Engineering
Reference no: EM13625601

You are a manufacturing engineer working for an aircraft company. The production lines you are responsible for are running at full capacity to keep up with the high demand. One day, you are called into a meeting where you learn that one of your supplies of bolts has been forging test results. The tests were never done, so no data exists to tell if the bolts in question meet your standards. You do not know how long the forging of the test results has been going on. You are only told that it has been awhile. This means that your whole production line including the planes ready to be delivered may be affected. You are asked to develop a plan to manage the crisis. What do you do?

Some background info:

1.) Bolts are tested in batches or lots. A specified number are taken out every batch and tested. The testing typically involves loading the bolts until they fail.

2.) The bolts do not have serial numbers so it is impossible to identify the lot number from which they came.

3.) The supplier who forged the tests supplies 30% of your inventory of all sizes of bolts.

4.) Bolts have their manufacturer's symbol stamped on the head of the bolt.

5.) It takes weeks to dissassemble or assemble an aircraft.

6.) Stopping your assembly line completely to dissassemble al aircraft could put your company in financial risk.

7.) Your customers are waiting on new planes and any delays could cause orders to be lost.

8.) The FBI arrested those who forged the test results and their business has been closed temporarily.

9.) Your entire inventory is store in bins by size, and each bin has a mixture of manufacturers.

Reference no: EM13625601

Questions Cloud

A 10-cm-diameter pipe widens to 20 cm then narrows to 05 cm : a 1.0-cm-diameter pipe widens to 2.0 cm then narrows to 0.5 cm. liquid flows through the first segment at a speed of
Obtain the continuity equation in cylindrical coordinates : obtain the continuity equation in cylindrical coordinates by expanding the vector form in cylindrical coordinates. to
A well-insulated turbine operating at a steady state : a well-insulated turbine operating at a steady state develops 23 mw of power from a steam flow rate of 40 kgs. the
What gain in gravitational potential energy does the launch : one of your summer lunar space camp activities is to launch a 1110-kg rocket from the surface of the moon. you are a
Bolts are tested in batches or lots a specified number are : you are a manufacturing engineer working for an aircraft company. the production lines you are responsible for are
If 35kgh of the final dried material is needed how much of : a centrifuge and dryer are used to remove water from solid material. a mixture of 38 solids is centrifuged to 65 solids
A long pryoceram rod with a diameter of 08m is clad with a : a long pryoceram rod with a diameter of .08m is clad with a very thin metallic tube for protection. the bonding between
She then flips the hubcap over and sees another image of : a dedicated sports car enthusiast polishes the inside and outside surfaces of a hubcap that is a thin section of a
How much must be drained from the tank and replaced with an : a vat holds 2.25103 kg of a 22.0 solution of ethylene glycol and water. how much must be drained from the tank and

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  The pipe are filled with ethyl alcohol to a level of 15 m

a cylindrical tank with its axis horizontal has a diameter of 2.0 m and a length of 4.0 m. the ends if the tank are

  The system undergoes a polytropic process with pv12 const

a piston cylinder assembly containing h2o initially has a temperature of 130degc and a specific internal energy of 700

  A metal is being cast into a cylinder

A metal is being cast into a cylinder which is 10 cm in diameter and 20 cm tall. The mold is bottom-gated (see class notes for geometry)

  A 02-cm-thick 10-cm-high and 15-cm-long circuit board

a 0.2-cm-thick 10-cm-high and 15-cm-long circuit board houses electronic components on one side that dissipate a total

  Calculate thermal efficiency of the power plant show the

a gas power cycle compresses air at 1 bar and 300 k state 1 through an adiabatic reversible compressor to 6 bar state

  A stream of refrigerant-134a at 1 mpa and 12 c is mixed

a stream of refrigerant-134a at 1 mpa and 12 c is mixed with another stream at 1 mpa and 60 c. if the mass flow rate of

  Determine the diameter of the shaft using tresca

Determine the diameter of the shaft using TRESCA and Von Mises-Henky failure

  A natural gas engine has a bsfc of 9000 btushp-hour when

1. a natural gas engine has a bsfc of 9000 btushp-hour when producing 200 horsepower. how many btus per hour does the

  If the velocity v of a paticle moving along a straight

if the velocity v of a paticle moving along a straight line decreases linearly with its displacement from 20ms to a

  The temperatures on the faces of a plane wall 15 cm thick

the temperatures on the faces of a plane wall 15 cm thick are 375 and 85 degrees celsius. the wall is constructed of a

  What is the rate of flow of cooling water through the

consider an ideal steam cycle that combines the reheat cycle and the generative cycle. the net power output of the

  The radius of the curvilinear path is 4 in what is the

the position of a particle moving in a curvilinear path is given by thetacos2t where theta units are radians and t

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd