QUESTION 1
You are an owner and hired an Architect to provide you with an Architectural design and then a structural Engineer to design your building. They collaborated and agreed on the concept and design and respected the scope of the project; the plans and specifications were completed. You proceeded and hired a general contractor to build the project.
(Just so there are no dilemmas, there was no tendering process; the project was given by invitation)
The Contractor realized that the site conditions may be more challenging compared to information and report originally supplied and outlined on the plans and specs and will therefor require additional costs.
The contractor comes to you to ask you that he will be requiring extras and you as an Owner are refusing to pay. All the contracts, for all parties were on a fixed price basis.
Now what?
Briefly describe:
a) The Architects and Engineer's responsibilities and obligations
b) The General Contractor's responsibilities and obligations
c) The Owner's responsibilities and obligations

QUESTION 2
Taking a twist to question 1, assuming the owner was the City of Laval. These are the differences from question 1:
- The contractor was the successful bidder and was awarded the contract & it was not a Design-Build
- The Architect and the Engineer on this project were employees of the city

a) Would the obligations, responsibilities, of the contractor be different?
b) The Architect & Engineer are the mandatories of the city, responsible for design, project management & supervision, does this change their responsibilities?

QUESTION 3
You are a contractor and for your most recent project, you are faced with extremely difficult clients. They are imposing, have no competence or understanding in construction, they try to interfere in the work site and attempt to impose methods of work that are contrary to the rules of art.
In your practice, you are familiar with Article 2119 C.C.Q. You understand that this article, is accessible to you and it allows you, the contractor, to evade responsibility by proving that defects resulting from decisions imposed by the client in, among other things, the choice of construction methods.
Q: Would this article in the Civil Code apply in this case, as you are facing with these clients, should any defects arise?

QUESTION 4
For any given construction project, an incomplete set of drawings and specifications (Called the Contract Documents) are a source of risk to Owners, Consultants and Contractors.
a) Identify what are the potential risks for each of the parties, the Owners, the Consultants, and the Contractors?
b) If there was no choice and each of the stakeholders had to work with incomplete drawings, in what ways can they anticipate mitigating potential damages and losses?

QUESTION 5:
Under the Civil Code of Quebec, Articles 6, 7 and 1375, the entering and performance of contracts must be carried out in "Good faith".
The cases we have discussed in class have looked at this issue in both an expansive and a restricted way; each case has been uniquely decided and many generalized principles have been born and have become the backbone support arguments, used as jurisprudence for construction cases being tried.
Q: In your opinion, if you had to pick just one case that you would say is the most effective to use, which would it be and why?

QUESTION 6:
Contract A is formed when a contractor submits a compliant bid in response to an invitation to tender. The principal terms of Contract A are the irrevocability of the tender during the acceptance period provided for in the "request for tenders (RFT)", and the obligation of both parties, if the tender is accepted, to enter into a contract (Contract B), on the terms set out in the RFT. The obligation of the parties to enter into Contract B arises from Contract A and is not dependent upon communication of the acceptance from the owner to the contractor."
a) What events give rise to a contract under an invitation to tender?
b) And if a contract arises, does it oblige the Owners and the bidders to always enter Contract B-the building contract, or could you see any exceptions?
c) In you opinion, would you change this principle, and why?

QUESTION 7:
This course dealt with legal issues in construction, we discussed laws, regulations, standard practice codes, the various court systems, and jurisdictions. More importantly, we dealt with many cases that brought to light some of the real issues in the construction industry and you saw how various issues were dealt with in the court system. During your employment, you will undoubtedly have to face complex situations, challenging your obligations as a professional

Q: All the questions below are inter-connected and should be a part of one answer
After taking this class, what are some of your take-aways, i.e., some of the key items that have impacted you and your opinions? how do you see yourself facing an issue now, compared to how your outlook was in January? And what factors would now shape your actions and decisions?

Attachment:- Legal Issues in Construction.rar

Reference no: EM133133090

Questions Cloud

Early Childhood Professional : Why is each thing learned important to you as an Early Childhood Professional? Who would you like to share this newfound information with, and why?
Calculate the number of production set-ups in a year : The average carrying costs per unit of material is P5 and the set-up cost per production run is P40. Calculate the Number of production set-ups in a year
Self-Awareness : Self-awareness, which is sometimes also referred to as self-knowledge or introspection, is about understanding your own needs, desires, shortcomings,
Potentially negative consequences for teacher : In this situation, what are some potentially negative consequences for the teacher, for the students and the school community?
BCEE493 Legal Issues In Construction Assignment : BCEE493 Legal Issues In Construction Assignment Help and Solution, Concordia University - Assessment Writing Service
Influence emotional and moral development : How do genetic and environmental factors work together to influence emotional and moral development?
Blending social relationships : Some counselors take the position that counseling and friendship should not be mixed. When do you think social relationships with current clients are unethical
Think about change you have experienced or initiated : Think about a change you have experienced or initiated. This can be a work example, or something that you have tried to change in your routines.
Average total cost and average variable cost functions : Suppose that a firm's inputs are labor (variable costs) and trucks (fixed costs) and the firm owns one truck and the cost function, in the short run, is C(q) =

Reviews

len3133090

4/26/2022 9:51:30 PM

Hi please find attached the writing assignment folder. The assignment is two: One is for the weekly readings( don''t use outside resources/references) and the instructions are in the folder while the other folder includes information regarding the final assignment. I also included a folder with some extra documents just in case you need some more info. Let me know if you have any questions or need help with finding some of the documents for the final assignment, thanks.

Write a Review

Business Law and Ethics Questions & Answers

  Research your selected case on austlii

HI6027: BUSINESS AND CORPORATIONS LAW - Advise your lecturer by email of your group members and case selected. PLEASE NOTE: Lecturer approval is required. You must NOT start on your assignment until your lecturer approves your group and case.

  Federal rules of civil procedure

This is a peer review presentation. Find a case from Kroll Ontrack's website that deal with one of the following the Federal Rules of Civil Procedure, explain why the rule is important in this particular case and create a presentation for peer-rev..

  Write a report on a special probationparole client and

write a report on a special probationparole client and programs that have been established to address this problem

  What is the correct complete citation for the halpern case

What is the correct, complete citation for the Halpern case? Summarize the relevant and material facts that are necessary to understand what the dispute and legal case was about

  Discuss the juvenile probation and parole officer role

Discuss the juvenile probation and parole officer's role and what is expected of these officers in working with juvenile offenders. Include a discussion on the Supreme Court's ruling in Fare v. Michael C. (1979). What makes this case significant

  What are the constitutional violations

What are the constitutional violations and other problems that may arise from bad or incomplete arrest warrants. such as victims or witnesses not being listed?

  Will there be hearings to confirm or reject the nominee

Who is the President's nominee to replace Scalia and is the nominee qualified to be on the Supreme Court? Will there be hearings to confirm or reject the nominee?

  What are the differences between employees and independent

what are the differences between employees and independent contractors? is it possible for an employer to reclassify

  Protection under the national labor relations

An RN (who is hired as stuff RN, not charge nurse) is terminated after their concerns regarding short staffing and low wages are brought to management

  May the instrument be reformed

Both parties agreed on this point but the contract as drafted contained an absolute sale. May the instrument be reformed?

  Religious beliefs to work on the sabbath

Other retail businesses in the mall in which your sports shoes shop is located have decided to open on Sundays from Noon to 6 P.M.  You decide to follow suit but two of your employees refuse to work on Sunday saying it is against their religious beli..

  Determine whether or not officer jones actions were justify

Determine whether or not Officer Jones' actions were justified by any of the three (3) ways whereby probable cause can be established. Provide a rationale for your response.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd