Basis for subsequent scheduling

Assignment Help Operation Management
Reference no: EM132296973

Introduction:

The work breakdown structure (WBS) forms the basis for subsequent scheduling, estimating, and monitoring/controlling activities. It is critical, therefore, that the work breakdown structure clearly communicate the scope of work and the project manager’s intent with respect to how the project is to be structured.

Some of you may have had the opportunity to develop a work breakdown structure in your professional careers; some may have had the opportunity to develop a work breakdown structure in the PMAN fundamentals class. In this review assignment, you will have an opportunity to brush up on your WBS knowledge and skills.

Scenario:

You have been recruited by your neighbor, the president of the local homeowner association, to lead an effort to modernize a park in the neighborhood. The homeowner association will pay for all supplies and equipment but all of the labor will come from residents in the neighborhood. You’ve walked the park with your neighbor to scope the project and the two of you have put together the following information:

The wooden bandstand needs to be scraped and re-painted. Residents would like to have a portable audio visual system integrated into the bandstand to support a weekly movie night and other neighborhood social events. The president of the homeowners association has already asked a local AV expert and community resident to research and select an appropriate audio visual system. Based on the estimated equipment cost, the president has decided to delay purchase and installation of the audio visual system until a later date (i.e., it will not be part of this project). However, he wants to go ahead with any bandstand infrastructure modifications needed to support the selected system. A subsequent meeting with the AV expert reveals the following: (1) the bandstand already has electrical outlets; (2) pads for four speakers will have to be mounted to the bandstand; (3) the structure of the bandstand will have to be modified to enable mounting a removable movie screen and create a space for an audio visual control station; and (4) the base of the bandstand will have to be modified to include a secure storage area for audio/visual equipment when not in use.

The playground area for younger children currently has a six-seat A-frame swing set. There is a broken weld joint at the top of one A-frame member that needs to be repaired and the entire structure needs to be cleaned and repainted. All six seats and chains sets need to be replaced.

Residents would like to have a wooden play structure installed to replace a merry-go-round that had been removed a couple of years before. Residents would also like rubber mulch to be installed under and around the swing set and the play structure.

The koi pond used to be an attraction for residents. Since the aeration system failed several months ago, the fish died and the pond has become overgrown with algae and other contaminants. Residents would like the pond to be restored to its former glory. You note the work scope will include draining, cleaning and refilling the pond; repairing the aeration system, and restocking the pond with fish.

Six park benches need to be cleaned, scraped and repainted. One or two may need some repairs.

The park currently has only two trash receptacles and both have seen better days. The residents would like four new trash receptacles and four new recycle receptacles located throughout the park. Trash and recycle receptacles should be paired together.

There is a very small grassy area, used for picnics, at one end of the park with one dilapidated picnic table. Residents would like the grassy area expanded in size to accommodate three picnic tables with benches. One new trash receptacle and one new recycle receptacle are to be located in this area as well as three new or refurbished picnic tables.

Some residents would like to be able to use the existing sports court for games like corn-hole toss. Unfortunately, the court was originally build for bocce ball and the few residents who play are very vocal and against any multi-purpose use of the court, typically citing potential damage to the turf. You and your neighbor decide the best solution would be to build a second identical court that could be used for other activities. Artificial turf will be installed in both courts to minimize damage to the playing surface.

Assumptions:

The neighborhood park is owned and managed by the homeowner association.

No permits or outside approvals are necessary to do the work.

The homeowner association has sufficient funding available to pay for material and equipment.

A WBS Dictionary will not be created. The WBS will be the only planning document available to other team members.

Assignment:

Based on the information provided above:

Create and present a work breakdown structure incorporating proper WBS core characteristics (except as noted below). The WBS may be presented in either a graphical or tabular format.

Decompose products/outcomes sufficiently to insure all elements of the project scope are included and non-scope elements are excluded.

For this assignment, include at least two work packages for each lowest level product/outcome. Work package descriptors should clearly support identification of the work necessary to deliver the lowest-level product/outcome. Remember that a work package applies to only one organizational entity and typically addresses only one type of work. For example, digging a ditch and paving a section of road would be two separate work packages. Each of these work packages could be further decomposed into component activities. For example, digging a ditch could be further decomposed into component activities like: (1) marking underground utilities; (2) clearing trees and shrubs; (3) renting the ditch digging machinery; etc. Do not decompose work packages into their component activities

Include a hierarchical WBS numbering system; ensure all WBS elements are properly identified in accordance with this system.

The WBS must clearly communicate the work scope and your intent with respect to how the project is to be structured. Work packages must be clearly distinguishable from products/outcomes. To achieve this requirement, you may deviate from WBS core characteristics with respect to how work packages are described.

Do not include any scheduling or resource information, task dependencies, or milestones.

Reference no: EM132296973

Questions Cloud

Develop a MATLAB program for solving the problem : 301023 Advanced Computational Fluid Dynamics Assignment, Western Sydney University, Australia. Develop a MATLAB program for solving the problem
How the decisions made in this project will affect business : Your implementation was successful, and it's time to plan ahead for future projects. One important piece of project reflection and creating future proposals is.
Describe what is e-commerce and mobile technology : Your company is experiencing decline in business because of competition. Your manager thinks they may be able to turn the company around if they can get help.
Alignment with costco corporate mission statement : Identify specific HR policies and practices in place at Costco, and evaluate their alignment with Costco’s corporate mission statement.
Basis for subsequent scheduling : The work breakdown structure (WBS) forms the basis for subsequent scheduling, estimating, and monitoring/controlling activities.
Explain how given topic is relevant to network security : Choose any topic related to Network security. Explain how it is relevant to network security. Be as clear as you can in explaining your topic by using examples.
Economic order quantity for purchases of these clickers : What is the economic order quantity (EOQ) for purchases of these clickers?
Discussing what database auditing is in detail : Include a discussion of what database auditing is and what it does. Consider why these new roles were introduced and what problem they are meant to resolve.
Proposed project for changing nursing home admission : Describe the who, what, when and where in a proposed project for changing nursing home admission guidelines.

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd