Basic environment project plan development

Assignment Help Other Engineering
Reference no: EM13778746

1. Executive Summary
This particular section of the project plan offers an overview of the scope, objectives and the purpose of the project for which it entails a written plan, the project constraints, and assumptions, detailed summary of the project budget and schedule, a list of project deliverables, and the layout plan for the developing the project management plan.

XYZ Company assets are valued at $25 million dollar data collection and Analysis Company that has been operating less than two (2) years. The company is expected to grow by 60% over the next eighteen (18) months. XYZ Company currently collects data using Web analytics and combines it with operational systems data. Web analytics is an increasingly important part of most business marketing plans. XYZ Company is looking for ways to leverage the collected data but wants to ensure that the information technology infrastructure will support the expected growth that the company is anticipating.
In this project it mainly deals with the improvement of the current data base data warehouse and data transfer and data retrieving. XYZ Company's project proposes to provide best quality services regarding data collection and database for our clients beyond the standard of the contemporary age.

The company's project proposes to increase the current ten terabyte data by twenty per cent annually. It also describes the relationship and integration between systems and infrastructure. Database and Data Warehousing, Analytics, Interfaces and Cloud Technology, and Infrastructure and Security should be considered.

The project aims at expanding the storage of data due to the research expansion that is aimed at being achieved. With an expected duration of a going concern, the lifespan of the project is expected to be endless ceteris paribus. However, it is to be subdivided into sections of the years to help in achieving of the goals and objectives. Objectives include covering more research beyond into operational units for companies and advising them based on the results of the research(Yin, 2003).

Companies that deals with data collection, usually have a gigantic collection of information that more commonly goes up to terabytes. Data Warehouse is the only one choice though not as structured as the relational databases, but when used consistent with them data storage turns out to be a giant support. Every moment, a single page visit generates numerous of records to be saved. The information may get outdated, but it can't be deleted because a few months down the line, it is going to be used for evaluation of the company. This assessment of the future possibilities of the given industry depends on - how the info is collected and how efficiently it be organized to provide a clear snapshot for analysis.
Being the CIO of the company I had to search for the data warehouse vendor that can improve our analytics operations.
The Project deals with the improvement of the current data base data warehouse and data transfer and data retrieving. The project proposes to provide best quality services regarding data collection and database for our clients beyond the standard of the contemporary age. The project proposes to increase the current ten terabyte data by twenty per cent annually. Describe the relationship and integration between systems and infrastructure. Note: Database and Data Warehousing, Analytics, Interfaces and Cloud Technology, and Infrastructure and Security should be considered.
Business Analytics refers to practices, skills and technologies for continuous iterative investigation and exploration of past enterprise performance to gain drive and insight business planning. It also refers to the practice of methodological and iterative examination of business's historical information with the individual essence of statistic making. This Business Analytics can to an extent assist companies optimize and automate their business approaches. Companies whereby information data plays a crucial role acts on its statistical data as a corporate strength and controls it advantage competitive gaining. A business analytics which is successful would typically rely on experienced and highly skillful professionals and data quality who have well understanding of technologies, comprehends the firms processes in details and knows how work with it. Also, the organization must have proper infrastructure sustain and support the procedures of business analytics.

A network infrastructure is termed as the interconnection of a group of computer systems that are joined by numerous sections of telecommunications architecture. And to be more specific, this network infrastructure is meant to represent the organization of its various configuration and their parts for example, computers networked individually to cables, switches, network access methodologies, routers, wireless access points, network protocols and backbones. Infrastructure can exist in two forms either closed or opened, in such that a closed architecture of private intranet or the open architecture of the internet.

This can be performed as a combination of both or over a wireless network or wired connections.
The network infrastructure can be represented typically in the simplest form in which is to be made up of a hub to both join the computer machines to the grid connection, one or many computers, internet or network connection and link numerous systems together. The hub usually enters the computers and does not determine the data flow from or to any particular systems.

To limit or control access to machines and manage information movement, the switch substitutes the hub to come up with network protocols which determine how the systems interact with one another.

To permit the formed network by the systems to communicate with others, through the network connection, router is an essential requirement, which links the networks and typically offers data exchange of common language, depending on the particular regulations of each network.

1.1 Scope, Objective, and Purpose

• Define the scope and the purpose of the project.
The key goal of this kind of project is to offer software security, infrastructure and demonstrate the software projects being carried out in the course of the development of business requirements.

The aim of the project is to offer:

-Basic environment project plan development

- General scientific database and data warehousing design

- Software development tools

- Demonstrate the Analytics, Interfaces, and Cloud Technology

- Document templates and documentation tools and the support activity essential to guarantee that universal grid-enabled surrounding is available.

• Describe any considerations of the objectives or scope to be excluded from the deliverables and the project.
The project plan should adopt or use the existing where possible the software tools. Tools are emerging from Microsoft Visio, open software, software security, database, data warehousing and any other communities that can be utilized.
The core goal of the project plan is to develop and define an infrastructure and a process. The later maintenance of the software infrastructure beyond the inspection and business requirement will need a separate resources and planning.

• Ensure that the scope statement is steady and consistent with similar statements in the company case, other business-level documents or relevant system-level and the project charter.
Because such infrastructure & process project is to attain uniformity in the development of the various software packages of the project deliverables application area.
The work references for the project deliverables is an essential requirement for writing the final report on the management of the software. The universal recommendation of the project plan can be summarized as:

- All project deliverables must employ the same sets of standards, procedures, and tools.

- use the commonly adopted commercial software or open-source where available

- Avoid using software that do not have a license or may bring some problems.

- Avoid finding a software solution but also engage other IT experts.

• Describe and identify the system or business needs to be satisfied by the project.
The project plan will comprise of the numerous software projects that require to be launched and, therefore, to get universal infrastructure will offer a surrounding that will permit:

- Reduction of the cost by having projects that will share the resources both in terms of worldwide efforts to uphold sharing of usual services and

software licenses, of hardware equipment and a project infrastructure, etc.

- Easier exchange of communication and information among projects.

- An infrastructure that is more advanced than if each person project was building its own.

• Provide a concise detail of:

- The objectives of the project,

- The deliverables needed to meet the project objectives, and

- The procedures by which the fulfillment of the objectives will be determined.

The primary project goals if to offer the deliverables of the projects an infrastructure for the:
- Components that make the software phase's development, for example, testing, planning, documentation, and development.

- Overall service required by any project, such as collaborative facilities, a repository, and a project website.

• Describe the connection of this project plan to the other projects deliverable.
The software projects is going to function usually in offering facilities and services for the other deliverables software projects (e.g. updating the project plan). But this artifacts use will be overall and, therefore, accessible to all other projects and the software experiments.

• If appropriate, explain how this project plan will be integrated with other ongoing work processes or projects.
The project plan will utilize as much as possible prevailing services and procedures accessible in the experiments, documentation and in the software application processes. The usage and integration of such kind of the processes are a crucial goal of the project.
Planning is the first and foremost ingredient in this mix. You will need access to blueprints and the design of the building for drop locations whether it be for data and voice or electrical. You will also have to allow locations for peripherals, projectors, VTC, etc. A server room is going to be needed, so make sure that it is sizable for future growth of the network. The specs for the floor should be outlined. Try and label all cables because this will help with unneeded confusion later on down the road. Backup power for the backups should be in place also. There are cooling requirements for the server room so make sure you get the specs.
The media that you choose can make or break your networks speed. Try and make it a goal to install a couple of drops at each location for future expansion. If an additional phone or computers are added the location will already be physically installed. You will have to a lot enough time to move your existing lease lines and any other lines. Remember to save everything on your system before you take it down. After all is said and done a test should be performed to ensure everything is up and running.
XYZ Company is engaged in Web analytics, whichis a generic term meaningthe study of the impact of a website on its users. Ecommerce companies and other website publishers often use Web analytics software to measure such concrete details as how many people visited their site, how many of those visitors were unique visitors, how they came to the site (i.e., if they followed a link to get to the site or came there directly), what keywords they searched with on the site's search engine, how long they stayed on a given page or on the entire site and what links they clicked on and when they left the site.
Web analytic software can also be used to monitor whether or not a site's pages are working properly. With this information, Web site administrators can determine which areas of the site are popular and which areas of the site do not get traffic. Web analytics provides these site administrators and publishers with data that can be used to streamline a website to create a better user experience (Peppers, 2008).
XYZ Companywas responsible for carrying out an investigation of how best to offshore their information systems services and decided to go with a large service provider in Okinawa, Japan. They decided to negotiate with the Japanese company for maintaining a significant portion of their database services. Following a year of intense planning, communication, and transition, the bulk of database maintenance was contracted out to the service provider in Japan.
Outsourcing occurs when information systems activities are carried out by aprovider outside the organization.
Project managers are often involved with negotiation and management of contractswith international vendors for the delivery of information systems services.
Skills Required by the IT Management ofOffshore Projects

Contract negotiation and management

Relationship management

Risk assessment and management

Planning and integration

Business process redesign

Enterprise needs analysis and testing

Security and privacy planning

Outsourcing of information systems services to countries outside the US.

Just because you can get 10 Gigabit Ethernet here today and higher speeds do not mean that you need those ports all over the LAN. Too often customers purchase the fastest equipment possible thinking they need it, even though their existing 100 Mbps network is only running at 5% capacity. While it is definite to ensure that core switches can support these higher speeds, you may be advising the customer to waste a lot of money if you tell them that 10 Gigabit switches are needed everywhere. While these always seem to be left off purchase orders, network management tools are invaluable in providing maximum network uptime. Your goal is to offer the customer the lowest price possible.
More customers are deploying wireless LAN technology and IP telephony. Wireless LAN access points are easiest to install when Power over Ethernet (PoE) is available. IP telephony utilizes phones that connect to and draw power from the LAN.

Reference no: EM13778746

Questions Cloud

Compare and contrast two business research papers : Compare and contrast two business research papers as to describe how the researchers utilized the hypothetico-deductive method.
Assignment on ttp1 for assign the experts : This plan must include each of the seven Integrated Team Projects and the TPP-2, including individual assignments, with leadership assigned to each assignment and working assignments for each team member.
Perform job search for position of your choice at a company : Perform a job search for a position of your choice at a company. Imagine that you are applying for this job. Upload a resume (either fictional or factual) in either chronological or functional formats.
Current issues pages of the american counseling association : Explore the Current Issues pages of the American Counseling Association's (ACA) Web site, provided in this unit's studies. Read about the various federal policy issues that the ACA is currently working toward changing. Then, to complete your post:
Basic environment project plan development : The company's project proposes to increase the current ten terabyte data by twenty per cent annually. It also describes the relationship and integration between systems and infrastructure. Database and Data Warehousing, Analytics, Interfaces and C..
Write a paper on business and technical writing : Write a paper on Business and Technical Writing.
Describe an efficient filing system to store large word doc : Describe an efficient filing system to store a large number of Word documents on your personal PC.
Find a complete list of the non-digital evidence : A complete list of the non-digital evidence you found in the workspace that you could collect (or at least search), including what significant information might be found in that evidence;
Discuss ethical and legal implications of using technology : Discuss any ethical, legal, and security implications of using technology to create and share numerical data.

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd