Atual discharge of a water pipeline

Assignment Help Civil Engineering
Reference no: EM1383564

As a graduate you are required to design a 15.3 km water pipeline to convey a discharge of Q=0.4-x/3000 cumecs between two large reservoirs in a large regional city, using the Moody diagram and the Darcy-Weisbach friction equation. The pipe material will be UPVC and internal diameters available from the preferred supplier are in 50 mm increments starting from 50 mm ID. In this pipeline there will be five 90° elbows, a fully open swing check valve, three gate valves that are fully open, and two 45° bends, with the pipeline fitting flush with the reservoir walls. If the elevation difference between the water surfaces is y = 25 + x/11 metres, what minimum pipeline diameter will be required to convey the design discharge? Once your design is complete, determine the actual discharge. The value of x equals 23.

Reference no: EM1383564

Questions Cloud

Research on the internet the published financial statements : Research on the Internet the published financial statements for one public corporation for the most recent two fiscal years
Food science question : A bowl of potato salad was left on picnic table for three hours on hot summer day. The microbial load was 300 CFU/g when the salad was put on table.
Social loafing and social facilitation : Critically illustrate out the difference between social loafing and social facilitation? What are some factors of social loafing?
Using a grand strategy matrix approach : Using a Grand Strategy Matrix approach, what strategies are recommended for a firm that is a weak competitor in a slow-growing market?
Atual discharge of a water pipeline : If the elevation difference between the water surfaces is y = 25 + x/11 metres, what minimum pipeline diameter will be required to convey the design discharge? Once your design is complete, determine the actual discharge. The value of x equals 23.
Develop separate production plans for chase : The forecast for monthly demand is given below. On average there are 22 production days in a month. It takes one worker three days to complete one unit.
Implement method to create thousand random integers : Implement a method named posNeg which creates 1000 random integers. Range of numbers must be from -5 to +5 inclusive.
Flying horse and terrestrial horse : Frontal horns are trait because it is present in Arctic and Marsh unicorns an can be use to differentiate them from Flying Horse and Terrestrial Horse.
Process of social change and benefit of organizing : Discuss the process of social change and the benefit of organizing together for change over individual efforts.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Total vehicle delay in the cycle with queueing diagram

If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .

  Steps of dmaic abandoned

Assume that during the analyze stage an obvious solution is discovered. Should that solution be immediately implemented and the remaining steps of DMAIC abandoned?

  Cleaning paintbrush with solvent

The brush is immersed in the first volume and agitated until equilibrium is established, removed and the exercise is repeated with the second volume. Assume that the solvent remaining in the brush after it is removed from the first batch is insign..

  Maximum rod diameter on lathe machine

If the tensil testing machine can apply no more than 925 lbs. of force to the specimen, calculate the maximum rod diameter that should be used. (precision 0.000)?

  What is the new water content

A soil sample with a water content of 14.5% and unit weight of 128.2 lb/cu. ft. was dried to a unit weight of 118.8 lb/cu. ft. without changing its void ratio. What is its new water content (in %)?

  Depreciation using straight line-double declining balance

Calculate the depreciation using straight-line, double-declining-balance (DBB), and MACRS (current IRS regulation) methods; and tabulate the depreciation schedule.

  Determine the value of po

Determine the value of Po, as a funciton of H, for these two investment alternatives to be equivalent at an interest rate of i=15% per year.

  Overall gear reduction ratio

If the overall gear reduction ratio is 8 to 1, what is the maximum acceleration from rest (in ft/sec^2) for: a) the car with the base engine? b) car with the modified engine? Assume the car is on good dry pavement.

  Elevation and stationing of the low point

A 1600 ft long sag verical curve (equal tangent) has a pvc at station 1200+00 and elevation o 1500 ft. the initial grade is -3.5% and the final grade is 6.5%. determine the elevation and stationing of the low point, pvi and pvt.

  Cstr reactors of equal volume in series

Compare the total reactor volume required for 90% removal of the same pollutant in a CSTR system that contains a single reactor against a system that contains three CSTR reactors of equal volume in series.

  Crash at a railroad crossing

Due to a crash at a railroad crossing, an overpass is to be constructed on an existing level highway. the existing highway has a design speed of 50 mi/h.

  Horizontal and vertical component from this acting force

What would be the Horizontal and vertical component from this acting force see diagram

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd