Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Your instructor will assign a linear programming project for this assignment according to the following specifications. It will be a problem with at least three (3) constraints and at least two (2) decision variables. The problem will be bounded and feasible. It will also have a single optimum solution (in other words, it won't have alternate optimal solutions). The problem will also include a component that involves sensitivity analysis and the use of the shadow price. You will be turning in two (2) deliverables, a short writeup of the project and the spreadsheet showing your work. Writeup. Your writeup should introduce your solution to the project by describing the problem. Correctly identify what type of problem this is. For example, you should note if the problem is a maximization or minimization problem, as well as identify the resources that constrain the solution. Identify each variable and explain the criteria involved in setting up the model. This should be encapsulated in one (1) or two (2) succinct paragraphs. After the introductory paragraph, write out the L.P. model for the problem. Include the objective function and all constraints, including any non-negativity constraints. Then, you should present the optimal solution, based on your work in Excel. Explain what the results mean. Finally, write a paragraph addressing the part of the problem pertaining to sensitivity analysis and shadow price. Excel. As previously noted, please set up your problem in Excel and find the solution using Solver. Clearly label the cells in your spreadsheet. You will turn in the entire spreadsheet, showing the setup of the model, and the results. Linear Programming project: Benjamin Moore Company makes two types of paint, oil based paint and water based paint. It makes a profit of $2 per gallon on its oil-based paint and $4 per gallon on its water-based paint. Both paints contain two ingredients, A and B. The oil-based paint contains 90 percent A and 10 percent B, whereas the water-based paint contains 30 percent A and 70 percent B. Benjamin Moore currently has 8,000 gallons of ingredient A and 9,000 gallons of ingredient B in inventory and cannot obtain more at this time. Due to high demand, the company makes water based paint twice as much as oil based paint. Benjamin Moore wishes to use linear programming to determine the appropriate mix of oil-base and water-based paint to produce to maximize its total profit.
Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.
This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.
This assignment has questions related to probabiltiy.
Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.
Derive the Boolean Expression and construct the switching circuit for the truth table stated
Evaluate which equations are under-identified, just-identified, and over-identified.
Linear programming problem consisting of only two constraints with one objective function.
Find the natural domain of the given functions.
Compute the coecients of the polynomials using the term recurrence relation.
De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.
Questions related on mathematics in computing.
Complex problems
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd