Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Project name is Assessment of waste Water treatment plant: Emphasis on plant capacity and Economical sewer pipe material.
Please go through the points and write about that topics Literature review:
1 Introduction- (what are going to do in this chapter? With keeping the sequncesess )
2 West water treatment plant capacity assessment- (fixing the treatment plant (information),-what the data you want know before?-process of sewage treatment plant- Population discharge for fixing
3 Sewer pipe material- Types of the pipe- Soil condition- Cost of the pipe- Flow of pipe and diameter of the pipe
Verified Expert
This assignment tells that what is WWTP, its requirement. The WWTP is a very sophisticated and complex process having high level standards for whole plant. This plant should be able to withstand corrosive conditions. These corrosion may be micro-biological influenced corrosion or abrasive corrosion. It's a matter of caring for our environment and for our own health.
A simple supported beam 6m long is composed of two C200x28 channel RIVETED FRONT TO FRONT . What uniformly distributed load can be carried in addition to the weight of the beam w/o exceeding a flexural stress of 125MN/m^2
Determine a set of rectangular beam design values (b),( d) and (As) area of steel, that will be needed to support a factored bending moment (Mu=450 Kip-ft). Use (f'c=4,500 psi) and (fy=40,000 psi).
Base course aggregate has a target dry density of 119.7 lb/cu ft in place. It will be laid down and compacted in a rectangular street repair area of 2000 ft*48ft*6in. the aggregate in the stockpile contains
If this GCL is used as a liner beneath a 55-ft high landfill with a waste unit weight of 45 lb/ft3, what will be the hydraulic conductivity of the GCL at the bottom of the landfill
Plot the relationship between the approach speed v and thelength of the dilemma zone for the following data:a2 = 0.5g, δ2 = 1.0s,w = 65ft, L = 15ft, and τ = 4.5s (wherea2 is the acceleration
Calculate the metric tons of gravel required to fill an excavated area 70 meters by 50 meters by 2 meters deep if the gravel has a density of 1890 kg/(m^3).
A single stage rocket is fired from a launch pad just in front of the Library. The rocket engines impart a constant acceleration of 20 m/sec/sec for a total time of 40 sec. At that time, there is no more fuel in the rocket engine and the rocket conti..
State the assumptions of Rankine's theory as used in foundation
A tubular aluminium bar (G=28GPa) of square cross section with outer dimensions 50mm x 50mm must resist a torque T=300Nm. Calculate the minimum required wall thickness t_min if allowbale shear stress is 20MPa
Each wheel of an automobile has a weight of 48 lb, a diameter of 23 in., and a radius of gyration of 9 in. The automobile travels around an unbanked curve of radius 450 ft at a speed of 65 mi/h.
A nozzle is shaped so that the velocity of flow varies linearly from base to tip. Assuming quasi-one-dimensional flow, what is the convective acceleration midway if v-base= 1 ft/sec, v-tip = 4 ft/sec, and L=18"
What is work? Why is it path dependant? Derive the expression for reversible work from a closed system containing a simple compressible substance.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd