Jim s Outfitters, Inc., makes custom fancy shirts for cowboys. The shirts could be flawed in various ways, including flaws in the weave or color of the fabric, loose buttons or decorations, wrong dimensions, and uneven The design standard for the product calls for a fill level of 12.00{0.10ounces. The manager collected the follow- ing sample data (in fluid ounces per bottle) on the pro- duction process: OBSERVATION Sample 1234 1 12.00 11.97 12.10 12.08 2 11.91 11.94 12.10 11.96 3 11.89 12.02 11.97 11.99 4 12.10 12.09 12.05 11.95 5 12.08 11.92 12.12 12.05 6 11.94 11.98 12.06 12.08 7 12.09 12.00 12.00 12.03 8 12.01 12.04 11.99 11.95 9 12.00 11.96 11.97 12.03 10 11.92 11.94 12.09 12.00 11 11.91 11.99 12.05 12.10 12 12.01 12.00 12.06 11.97 13 11.98 11.99 12.06 12.03 14 12.02 12.00 12.05 11.95 15 12.00 12.05 12.01 11.97 a. Are the process average and range in statistical control?

Reference no: EM13252079

Questions Cloud

What are the decisions that need to be made : Calculate by hand how many labor-hours would be available in January and February. Calculate by hand the total costs in January and February.
Design a wireless sensor node : Develop a Sensor Circuit using commodity component and design a wireless sensor node using commodity wireless modules
Determine what is the maximum zener current allowed : For an ideal Zener, is the Zener voltage is 15v and the power rating is 750mW, what is the maximum zener current allowed What is the relationship between base current and collector current called
What is the maximum tension in the rope : A 56 kg student runs at 5.0 m/s, grabs a hanging rope, and swings out over a lake, What is the maximum tension in the rope?
Are the process average and range in statistical control : a. Are the process average and range in statistical control?
How many units are needed to break even : A manufacturing process has a fixed cost of $310,000 per month. Each unit of product being producted contains $32 worth of material and takes $36 of labor. How many units are needed to break even if each completed unit has a value of $118?
How fast is the center of mass of the two-stone system : A stone is dropped at t = 0. A second stone, with 6 times the mass of the first, is dropped from the same point at t = 56 ms. How fast is the center of mass of the two-stone system
What would be the break -even number of units : If the company had an option to buy the same part at $2 per unit, what would be the break -even number of units?
Find out identity of the metal : A 1.733 g sample of a metal reacts with hydrochloric acid to form a MCl2 type of salt and 380.0 mL of H2 at 20 degrees C and 720 torr pressure. a) Write a balanced net ionic equation for this reaction b) Determine identity of the metal.

Reviews

Write a Review

Operation Management Questions & Answers

  How would you prepare workers for an overseas assignment

You've just been made a manager in Sweden, known for its institutional collectivism. What incentives and reward structures would you use to motivate your employees? How would you prepare workers for an overseas assignment?

  Illustrate what is the con present engineering approach

Illustrate what is the Con present Engineering Approach also explain why should project managers be aware of it.

  What is the re-order point

The manager has assigned an annual carrying cost of 35% of the purchase price per crate. Ordering costs are $28. Currently the manager orders once per month.If the order lead-time is two weeks (ie 0.5 month) what is the re-order point?

  Illustrate what does it mean to take a systems view

Illustrate what does it mean to take a systems view of a project. Elucidate how does taking a systems view of a project apply to project management.

  Discuss the advisability of using modular assemblies

Discuss the advisability of using modular assemblies in manufacturing. (What are the advantages and disadvantages?) To what extent can these arguments be applied to service products?

  Describe the concept of the change management process

Describe the concept of the change management process within a project. Provide two specific reasons why having a structured change management

  Identify changes in forecasting methodologies and approaches

Identify changes in forecasting methodologies and approaches that have been influenced by current economic conditions.

  Compute optimal quantity also total annual cost of ordering

Ordering costs are $ 35 also annual carrying costs are 20 percent of purchase price. Compute optimal quantity also total annual cost of ordering also carrying inventory.

  A pizza delivery company promises to deliver all customer

A pizza delivery company promises to deliver all customer orders within one hour of receiving an order at one of its stores. Actual data for all pizza delivered during the past week showed that the average delivery time was 40 minutes and standar..

  Which was the exact amount of the receipts

Our firm represents David Johanssen, a doctor specializing in internal medicine.

  Which control should periodically reassess its approach

Which control should periodically reassess its approach to the marketplace with a good marketing audit?

  What are the quantities of planned order releases

Which type of inaccuracy is most likely to result in incorrect planned order release quantities for its dependent demand items - What are the quantities of planned order releases for item XYZ for the first six weeks

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd