ARBE3100 Construction Technology Assignment

Assignment Help Civil Engineering
Reference no: EM132983204 , Length: word count:3000

ARBE3100 Construction Technology - The University of Newcastle

Report - Basement Construction Report

Assignment objectives

On completion of this assignment the student should be able to:

1. Demonstrate knowledge of the ground and soil conditions, materials, systems and components used in the construction of commercial buildings;

2. Demonstrate knowledge of the techniques used to incorporate them into the building, including sequencing of operations;

3. Evaluate design alternatives in terms of buildability and cost;

4. Communicate design alternatives using drawings reflecting the statutory standards.

Assignment brief

Introduction
For Reports 1 and 2, your role is that of an architectural design and build construction organisation which has been approached by a client who wishes you to undertake the design and construction of a medium sized commercial retail development on a site they already own. The client's brief, the site plan and site investigation information can be found on Blackboard.

Task

You are required to submit a report outlining the design and construction of a suitable basement foundation for the commercial retail development. The report should contain:
- An introduction to conceptualize the problem, providing background and site analysis.
- A discussion and analysis of the suitability and buildability of the various methods and technologies available for the construction of the basement area (i.e. the whole of the basement construction) in response to specific site conditions, comparing and contrasting the advantages and disadvantages of each, with a reasoned explanation of why you have chosen your preferred approach and how the requirements of client are fully addressed.
- A tabular cost comparison of the various basement construction options considered.
- A step by step explanation (using drawings and/or diagrams to illustrate) of the major construction sequencing of tasks and activities involved in the construction of your chosen design. Site and floor layout plan(s) showing the details of the car park entry/exit etc. should be provided.
- A professionally written report, including such qualities as structuring sections and paragraphs to bring out a sound professional discussion, control of the conciseness and relevance of the discussion, and to use appropriate citation and referencing techniques.

You are required to make assumptions or ‘educated' guesses on any information/material that you believe to be missing. If this is the case you are to explain/justify these assumptions.

Attachment:- Assignment brief.rar

Reference no: EM132983204

Questions Cloud

How much is the bond investment on December : If the entity classified the investment at fair value through profit or loss, how much is the bond investment on December 31, 2020
What percentage of the nation''s workforce is in healthcare : This is a useful tool in charting the various impact factors that influence the health care organization in general and the human resources management departmen
How Dress-for-Success is accounting for the transactions : Explain how Dress-for-Success is accounting for the transactions under the cash basis method and how she should account for them if she did follow GAAP
Do you think we should continue the two party system : The United States has traditionally been a two party system. Many other Democracies and Republics have many parties (Europe).
ARBE3100 Construction Technology Assignment : ARBE3100 Construction Technology Assignment Help and Solution, The University of Newcastle - Assessment Writing Service
Prepare the statement of financial position as at february : Prepare the Statement of Financial Position as at 28 February 2021 clearly showing Abdul Ghani's opening capital, working capital (net current assets)
Calculate the maximum profit and loss : A three-month at-the-money call option on the stock is trading at $1.25. The risk-free rate is 4.0%. Calculate the maximum profit and loss
Discuss the effects of all five major accounting assumptions : Discuss the effects of all five major accounting assumptions on the accounting process and describe all five concepts' impact on the accounting process
How three factors introduce potential biases in performance : How three factors introduce potential biases in performance and risk measurements of portfolios? Option-like investment strategies

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compute the suitable equal tangent vertical curve

A 301 stainless steel wire is suspended vertically from itsend. The wire is 400 ft long, diameter .75 inches, specific weight= 489 lb/ cubic foot.

  What is the theoretical rate of moisture removal from grain

A model grain dryer is being used to investigate the drying process. It is discovered that the load cell which supports the dryer indicates that the mass of the dryer and its contentsinitially increases during the heat-up.

  Forces acting on member abe

Q1. Determine all of the forces acting on member ABE of the frame shown below.

  Establish and sketch the energy equation for the scenario

write solution in a organized and easy to follow matter. Will rate life saver for diagram or picture.Water leaves a treatment plant in a 500-mm diameter ductile iron pipeline at a pressure of 600 kPa

  Calculate the pressure p and the force t

Calculate the pressure p and the force T per linear mm along the (imaginary) longitudinal seam in the pipe at a point that is 100 metres below the open (free) water surface of the reservoir.

  Estimate the runoff from the watershed into the lake

A 5 km2 lake does not have a defined input but receives runoff from its watershed (25 km2). The area receives 60 cm/yr in precipitation. Evaporation from the lake surface is 10 cm/yr with watershed evapotranspiration of 20 cm/yr.

  What is the highest possibledesign speed for the curve

The road has 12-ft lanes. Due toexpensive excavation, it is determined that a maximumof 34 ft can be cleared from the road's centerline toward the inside lane to provide for stopping sight distance.

  Draw the bending moment diagram and shear force diagram

Use the concept of real work equivalence to compute the vertical deflection at the free end of the cantilever beam shown below. The 12 inch wide beam has a uniform taper and E=3000kips/in^2

  Calculate force and moment

Which software do we use to calculate force and moment, and draw shear and moment diagram? I really need this software to design my structural project. Please helps me... thank you so much.

  Explain construction project and construction

Explain construction project and construction Project stages in details?

  What is the equation for the applied load

The vertical deflection in a simply supported beam follows the following equation: v = -[(w_0*x)/(360LEI)](7L^4 - 10*L^2*x^2 + 3*x^4) What is the equation for the applied load w(x)? Note that wo is a constant value.

  Determine required diameter of each reinforcing steel bar

If the column is subjected to an axial compressive force of 800 kN, determine the required diameter of each reinforcing steel bar so that one-third of the load is carried by the steel and two-thirds by the concrete. Assume Esteel= 200 GPa and Econ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd