A major national insurer decided to evolve new business development practices. The project to implement this idea started in 2000 and was led by a succession of key senior vice presidents (VPs) as part of their executive growth. Twelve years later, the organization had still not finished with its stated purpose due to changing requirements, new ideas, a succession of leaders, and executive ambivalence. This effort had all the appearance of a major strategic initiative—three hundred people, a "war room" with a great storyboard, and lots of spokespersons. Key staff members were quick to extol the great progress made. However, when the new CEO asked, "Why are we doing this?" there was no coherent answer. Result: Within days, the entire program was scrapped. In less than a week, the project offices were vacant and phone calls went unanswered. When the project died, no one noticed except the executives who had been the project advocates. They were out of a job.
1. Explain the root cause of this situation. There was a huge disconnect between project management and the organizational strategy and strategic direction in this scenario. If so, how could this gap have been bridged?
2. Analyze the triple-constraints relationship among the project scope, cost, schedule, and quality. If quality is held constant and the scope is widened, what will happen to the cost and schedule?
3. Explain a WBS created for a project you have worked on. Was a WBS created for a project you have worked on? If so, did the team refer to the WBS while sequencing work and creating a risk plan? What was the outcome? If not, describe how the team determined tasks and sequencing. Evaluate the outcome. Cite additional challenges to a project that might result from poor work breakdown practices. The final paragraph (three or four sentences) of your initial post should summarize the one or two key points that you are making in your initial response. Justify your answers with examples and reasoning.
Access to the contracting organization extranet
: "Identify and discuss three significant threats traced to outside vendor access to the contracting organization's extranet"
|
Impact it would have on the business
: What type of cloud based service(s) would you recommend and what are the potential challenges that should be conveyed to the CIO in response to this request? Explain each in detail and the impact it would have on the business.
|
Determine the shear stress at distances
: The pressure drop needed to force water through a horizontal 1-in.-diameter pipe is 0.60 psi for every 12-ft length of pipe. Determine the shear stress on the pipe wall. Determine the shear stress at distances 0.3 and 0.5 in. away from the pipe wa..
|
What is the advantage of a call provision for an issuer
: What is the advantage of a call provision for an issuer?- What are the disadvantages of a call provision for the bondholder?
|
Analyze the triple-constraints relationship
: A major national insurer decided to evolve new business development practices. The project to implement this idea started in 2000 and was led by a succession of key senior vice presidents (VPs) as part of their executive growth. Analyze the triple-co..
|
Discuss the impacted and protected class populations
: Write a paper describing the group, their mission, and their message.Discuss the impacted and protected class populations they have targeted and any incidents they have been responsible for.
|
How do investors gauge the default risk of a bond issue
: How do investors gauge the default risk of a bond issue?- Why is the maturity of an amortizing bond not a useful measure?
|
Exceed the total number of stations in a line
: Can the critical WIP exceed the total number of stations in a line? Can critical WIP exceed the total number of machines in a line? Clearly explain the logic behind your answers.
|
Determine the manometer reading h
: Oil of SG 0.87 and a kinematic viscosity v = 2.2 × 10-4 m3 /s. flows through the vertical pipe shown in Fig. P8.25 at a rate of 4 × 10-4 m3 /s. Determine the manometer reading, h.
|