Reference no: EM132369764
For this assignment, write a paper of 750-1,000 words in which you analyze the concept of resource scheduling and evaluating various methods used to schedule resources in project management.
Your analysis should include the following:
An analysis of the benefits and challenges associated with resource scheduling
A discussion of at least two methods used to schedule resources and examples of when each method would be most appropriate, given the scope of the project
Choose which method would be most appropriate for the project your CLC team selected and explain why you felt it was most appropriate.
You must include at least two additional sources, one of which must be a journal article, outside of your textbook, to support your analysis.
Prepare this assignment according to the APA guidelines found in the APA Style Guide, located in the Student Success Center. An abstract is not required.
This assignment uses a grading rubric. Instructors will be using the rubric to grade the assignment; therefore, students should review the rubric prior to beginning the assignment to become familiar with the assignment criteria and expectations for successful completion of the assignment.
You are required to submit this assignment to LopesWrite. Refer to the directions in the Student Success Center. Only Word documents can be submitted to LopesWrite.