Your plant can make a certain component in house by utilizing equipment and facilities with fixed costs of $10,000.00. The material cost per unit for this component is $6.00 and the labour amounts to $12.00 per unit. Conversely, your plant may buy this component from another manufacturer at a price of $56.00 per unit. Use the "break-even of cost lines" approach to determine the ranges of quantity over which the item should be made in house and, respectively, bought from the outside supplier. You must use both the analytical approach (calculation) and the graphical representation (a diagram).

Reference no: EM132320657

Questions Cloud

Concepts in operations management : Analyze processes using business process re-engineering concepts in Operations Management.
What is the importance of culture awareness : What is the importance of culture awareness and Hofstede's research relative to teamwork?
What will be the planned production of legs : The planner has determined that the projected number of legs on hand is 60 units. If there is no previously scheduled production for legs
What is the design capacity : An auto service center that specializes in oil changes has two service bays that serve, on average, a total of 24 cars per eight-hour business day.
Analytical approach and graphical representation : You must use both the analytical approach (calculation) and the graphical representation (a diagram).
Labour cost productivity between two shops : What is the difference (in percentage) of the labour cost productivity between these two shops?
Assembly line that uses the kanban system : An assembly line that uses the Kanban system has a demand rate of 120 items/hour, the container throughput (circuit) time is 1 hour and the containers
What is the reorder point : The accepted level of stockout is at most 5% and the standard deviation of demand during the lead time is 20 unit and the lead time is 10 days.
What additional information is required for check algorithm : Let's estimate that this computational task belongs to class NP. What is additional information, that in this case is required for check algorithm

Reviews

Write a Review

Operation Management Questions & Answers

  Secondary wholesaling

Which of the following is also known as secondary wholesaling?

  Which side has the more persuasive argument

On what basis could County argue that it is conforming with the criterion at 1715 (3)? On what basis could the state agency argue that County’s application is nonconforming with that criterion? In your opinion, which side has the more persuasive argu..

  Money across border when doing business internationally

What is the best way to collect payments and move money across border when doing business internationally,

  Which factors affect pricing

Which factors affect pricing? How does competition play a part in pricing? Are there legal or ethical considerations in pricing your product?

  What is the break-even points

What is the break-even point? How many units must be sold to average $0.25 profit per unit?

  Find solution that corresponds to s1 and s2 equal to zero

Find the basic solution that corresponds to s1 and s2 equal to zero. Find the basic solution that corresponds to x1 and s3 equal to zero.

  What did the title of emperor mean during each period

How did the Europe under the rule of the Charlemagne differ from Europe during time of Constantine, and what did the title of "emperor" mean during each period

  Buffer in this type of business communication situation

Why is it necessary to include a buffer in this type of business communication situation? What is the role of a buffer?

  Define both hris and erp

Prepare a memo to senior management that summarizes how implementing a more complete system can benefit the HR department.

  How were the teams successful

What are the characteristics of this model team? What difficulties have they encountered as a team?

  Embedded part of supply chain management

The risk management will become an embedded part of supply chain management.

  Disadvantage of oral communication

An advantage of one-way communication over two-way is the fact that. A disadvantage of oral communication is that the

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd