Analysis of crashing critical tasks by instituting overtime

Assignment Help Project Management
Reference no: EM131887232

Baseline Plan

Project duration (days) =
Total Project Cost =
Total number of work hours(project) =

For each activity list the total number of work hours for each group and the total work hours.

Activity

Duration(wks)

Engineering

Operation

Procurement

Marketing

Total

Select and order equipment

 

 

 

 

 

 

Receive Equipment

 

 

 

 

 

 

Install and set up equipment

 

 

 

 

 

 

Finalize bill of material

 

 

 

 

 

 

Order component parts

 

 

 

 

 

 

Receive component parts

 

 

 

 

 

 

first production run

 

 

 

 

 

 

Finalize marketing plan

 

 

 

 

 

 

Produce Magazine ads.

 

 

 

 

 

 

Script for TV ads.

 

 

 

 

 

 

Produce TV ads.

 

 

 

 

 

 

Begin ad campaign

 

 

 

 

 

 

Ship product to customers

 

 

 

 

 

 

List all activities that were crashed to lower the project cost. Add additional rows to the table as needed

Activity

Original Duration

Original Cost

Current Duration

Current Cost

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

List all resources that are assigned to work less than four hours on a task
There shouldn't be any

List all resources that are overloaded and explain why.

There could be some if crashing/overtime is used that decreases the fixed cost of the project more than it is increased by the variable labor costs.

Project Requirements

Project participants need not follow a flat contour for their work.

Project participants may be assigned overtime work for a maximum of three hours per day. Overtime work must be budgeted at overtime rate.

Project participants may not be assigned to work more than 11 hours per day.

Task splitting is not allowed. That is, when a task starts it must continue to completion without interruption.
Indirect cost for the project is $1,000 per day

Task durations may be reduced by a maximum of 1/3 of original duration through proportional assignment of direct labor resources

Details for the simulated project.

Included is a MSP file with the details imputed

Need -

1. the resources allocated across the tasks with the assigned constraints

2. A baseline project created: length (weeks) cost (Variable/wages + Fixed 1,000 a day project cost)

3. Analysis of crashing critical tasks by instituting overtime & focused allocation to decrease length of project therefore decreasing overall project cost

Attachment:- Project Requirements.rar

Verified Expert

This job is based on analyzing the 1. the resources allocated to the tasks with the assigned constraints 2. A baseline project created 3. Analysis of crashing critical tasks by instituting overtime & focused allocation to decrease the length of the project.

Reference no: EM131887232

Questions Cloud

Determine the current in the loop in milli-amps : Determine the current in the loop in milli-amps (the resistivity for copper is 1.72 × 10-8O.m).
Compare elected and appointed law enforcement positions : Identify and explain three major issues that must be addressed by leadership during the labor-management negotiation process.
How many loops of wire will be needed : A simple AC generator with a maximum emf of 30.0 V is to be constructed from loops of wire with a radius of 0.20 m, a rotational frequency
Define disorder of brain development : Read the article titled "Ethical Considerations in Geriatric Neuropsychology," and view Dr. Chung's Ted Talk, Autism - what we know.
Analysis of crashing critical tasks by instituting overtime : Analysis of crashing critical tasks by instituting overtime & focused allocation to decrease length of project therefore decreasing overall project cost
Perpendicular to the axis of rotation : If the loop rotates in a uniform magnetic field of 0.7 T, which is perpendicular to the axis of rotation, what will be the maximum output voltage?
Identify professional standards and values : Identify professional standards and values that apply across various components of the criminal justice system on a national level.
Cause attenuation of physical waves : How absorption and scatter occur, and why they cause attenuation of physical waves.
Discuss words of encouragement and verse in the bible : Write 2 pages essay acknowledging a high school student who is selfless and respectful both in class and home. Write words of encouragement and verse.

Reviews

len1887232

3/5/2018 2:15:33 AM

Project Management: Microsoft Project Attached are the details for the simulated project. Included is a MSP file with the details imputed Term Project Requirements Project start date Project participants need not follow a flat contour for their work.

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd