Reference no: EM132175921
1. Giddy Construction Company removed the weight indicator and all warning stickers from their jacks that are used to lift homes. Two workers were using the jacks in a situation where they were undersized causing a catastrophic failure and collapse, killing both workers. What is likely the root cause?
A. Removal of all labels.
B. Insufficient training.
C. Jack failure.
D. Freak accident.
2. This is a systematic process that utilizes other analysis methods to determine the cause(s) of the accident.
A. FMEA.
B. Root cause analysis.
C. FTA.
D. Fish bone.
3. This is the second step in the root cause analysis process that is a direct result of one event that triggers another.
A. Causal factors.
B. Pre-existing factors.
C. Production-based.
D. Review of causal factors.
4. This is an analysis that is reversed starting with causes and branching out to consequences.
A. Sensitivity analysis.
B. FMEA.
C. Root cause.
D. Scenario model.
5. A local effect in the FMEA Analysis requires identification the location’s effect on the system. This is followed by an FMEA on...
A. The same level being analyzed.
B. Different levels being analyzed.
C. Multiple levels being analyzed.
D. Community-levels being analyzed.