Analyse the structure of the uk project management system

Assignment Help Project Management
Reference no: EM133451539 , Length: word count:3000

Question: Procedure in the event of illness or other valid cause (extenuating circumstances)

If you believe that:

• your performance in assessment or reassessment has been impaired, or;
• you were unable to attend for an assessment or reassessment, or;
• you were unable to submit assessed or reassessed work by the scheduled date due to illness or other valid cause (as defined in the Procedures Governing Extenuating Circumstances), may apply for extenuation for the relevant component(s)

Learning outcome 1: Analyse the structure of the UK project management system and possess a critical awareness of the managerial role played by the architectural, engineering and construction (AEC) industry
Learning outcome 2. Evaluate the AEC professional's role in society and the community

Thinking Skills
3. Explain and critically assess procedures involved in engineering management
4. Evaluate the importance and application of quality assurance and quality control procedures within the construction industry
5. Analyse the main forms of civil engineering contracts and procedures and apply them to a given task.
6. Critically assess the environmental impact of construction projects and the use of sustainable methods of construction

Subject-based practical skills
7. Use various analytical methods to evaluate project programming & controls and critically evaluate how the findings may be used in the decision-making process.

Skills for life and work (general skills)
8. Communicate ideas, principles and facts to a wider audience in the form of a presentation.

The Mental Wealth Competencies, listed below, are a way to reflect on how you act and react to situations, and what ‘softer' skills you are developing throughout your working life in general and this assignment in particular:

• Digital Proficiency (DP)
• Emotional Intelligence Development (EID)
• Social Intelligence Development (SID)
• Physical Intelligence Development (PID)
• Cultural Intelligence Development (CID)
• Cognitive Intelligence (CI)
• Industry Connections (IC)
• Community Connections (CC)

Task

As in the real world, you will be dealing with ambiguous and uncertain situations and information. You will need to manage, mitigate and justify any assumptions according to your best professional understanding. You must deliver to your client a professional report that addresses their concerns and puts forward your suggested outline design / action plan with ways to implement that plan. It is important to remember that you are acting as a professional consultant and must put forward what you believe to be the most appropriate solution remembering you have a professional duty to society which may be contrary to your client's needs.

There are two parts to the assessment of this module and they are included in this one assignment as follows: (Please submit two separate documents)

1. Case Study, Technical Report
2. Individual Mental Wealth Reflective Log

The technical issues will be covered in part (A) and your professional ability to manage yourself will be demonstrated in the Reflective Log (B).

Assignment brief
Keep a log of all the challenges that you face and reflect upon this in your Reflective Log.

The structure of the report and reflective log
The main features of a report are described below to provide a general guide. These should be used in conjunction with the instructions or guidelines provided. Please follow the instruction provided on the instruction guide document.

Reference no: EM133451539

Questions Cloud

What are xero total assets, total liabilities : State the full name of the Chairman and the CEO of Xero Ltd. As reported in the Annual Report provided, what was the CEO's total remuneration package in 2022?
Explain why contingency theory of leadership is considered : Select any (5) components of organizational structure that might be observed by looking at the organization's organizational chart. Explain why
Explain the rational decision-making model : Explain the Rational Decision-Making Model. Describe 2 hypothetical situations in which an individual would follow all of the steps of this model.
Explain the importance of accrual accounting and proper : Explain the importance of accrual accounting and proper application of the matching principle for the computation of contribution margins and break-even points.
Analyse the structure of the uk project management system : Mental Wealth Professional Life (Engineering Management) - Analyse the structure of the UK project management system and possess a critical awareness
Consider multiple constituencies with divergent needs : consider multiple constituencies with divergent needs including ethical objections and social responsibility on how to lead an organization through a change
What is the average cost of the promotion : For each tire sold, what is the average cost of the promotion (in $)? What is the probability that Grear will refund more than $25 for a tire?
Project oxygen resuscitates google poor-performing : Why is not having the greatest technical expertise the key to being a good supervisor at Google?
Describe a great working environment for you : Describe a great working environment for you. Evaluate specific policies and practices that create a cohesive organizational culture.

Reviews

Write a Review

Project Management Questions & Answers

  Implement it project planning and selection techniques

Implement IT project planning and selection techniques and apply the project management framework to IT projects within a global context;

  Identify a change initiative, use the responsibility chart

Identify a change initiative, use the responsibility chart to list some of the actions associated with that change and assign the people involved according

  Case study - sydney opera house

Analyse and report on the correct initiation of the project by applying PMBOK methodology of a case study project

  Describe your level of experience

BUSINESS 100 University of Phoenix describe your level of experience (entry, proficient, advanced). Include in your answer the type of work you performed,

  Essential features of a project communications plan

What are the essential features of a project communications plan (also called the communications management plan)?

  Create risk register for developing design for new

Create a risk register for developing a design for a new, all electric motor scooter project, Subdivide the risks by categories.

  Appropriate template of a project plan online

Find an appropriate template of a project plan online. Use the template to write a plan for your project. Prepare a 30 minute PowerPoint presentation of the plan and submit it to your lecturer

  Reflective learning journal

Critical review and evaluation of literature on selected topic - Project management plan for Project Scope, Schedule and Cost

  What are the normal project completion time

What are the normal project completion time and the critical path and what activity should be crashed to reduce the completion time found in by one week

  How do you anticipate bottlenecks when planning for project

What advantages and limitations of project management are identified in the simulation? How do you anticipate bottlenecks when planning for a project

  Incident action plan

Incident Action Plan

  Immediately identify solutions for implementation

In many projects, teams are tempted to immediately identify solutions for implementation.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd