Analyse and evaluate electrical and electronic faults

Assignment Help Mechanical Engineering
Reference no: EM132058327

Assessment 1 - Observation and analysis reports

Task - 1 - Vehicle 1- Assessment Instructions

For this assessment, you are required to analyse and evaluate an electrical or electronic fault in the common rail diesel engine management system of a vehicle based on the scenario provided.

Scenario - A vehicle fitted with common rail diesel engine has multiple complaints. MIL warning light stays on. Fuel filter warning light comes on intermittently. When accelerated vehicle is not responsive and engine is hunting.

1. Identify and confirm work requirement

  • Purpose and objective of the analysis
  • Collect vehicle information and specification
  • Confirm the fault by presenting evidence
  • WHS requirements including personal protection needs. identifying hazards and managing risk

2. Prepare for analysis by:

  • Establishing standard measures to evaluate the objective
  • Following the repair manual and preparing diagnose procedure
  • Listing all the required resources such as tools, equipment and material
  • Identifying the components for analysing the cause of fault in the common rail diesel engine management system

3. While analysing you should

  • Present trouble shoot method according to manufacturer specification to carry out failure analysis
  • Present testing procedure used for relevant components following all safety and environmental requirements
  • Confirm your findings using reliable process, for instance replacing the faulty component and check if the symptoms still present
  • Compare the readings with repair manual
  • Analyse the symptoms and provide conclusion and document the process according to workplace requirement

4. After analysing provide repair recommendation by

  • Identifying the cause of fault for component failure or system failure
  • Provide various possible suggestions to resolve the issue and choose the best possible option after taking into account different variants such as time, cost and available resources. It should be done in compliance with regulatory requirement and Australian design rules.

5. After completing the work

  • Validate the work to meet workplace expectations.
  • Follow cleaning procedure Including disposal of waste and non-recyclable and collection of recyclable material.
  • Check and store all electrical and mechanical tools and equipment upon completion of work in accordance with procedures to handle broken tools
  • Report recommendations in the report attached.
Submission should include:

Introduction
Vehicle details
Confirm the fault (visual inspection/pre repair road test/ Freeze frame data)
Order of the task to be performed
List of required resource
Testing procedure of relevant component
Test result and comparison with specification
Conclusion/repair suggestion
Reason for component and/or system failure
Comments
Result

Task - 2 - Vehicle 2 - Assessment Instructions

For this assessment. you are required to analyse and evaluate an electrical or electronic fault in the petrol engine management system of a vehicle based on the scenario provided.

Scenario - A vehicle has multiple complaints as below.

Complaints: MIL light stays on. power loss, rough idle, rattling noise and excessive smoke coming out of exhaust

1. Identity and confirm work requirement

  • Purpose and objective of the analysis
  • Collect vehicle information and specification
  • Confirm the fault by presenting evidence
  • WHS requirements including personal protection needs. identifying hazards and managing risk

2. Prepare for analysis by:

  • Establishing standard measures to evaluate the objective
  • Following the repair manual and preparing diagnose procedure
  • Listing all the required resources such as tools, equipment and material
  • Identifying the components for analysing the cause of fault in the distributor-less electronic ignition petrol engine management system

3. While analysing you should

  • Present trouble shoot method according to manufacturer specification to carry out failure analysis
  • Present testing procedure used for relevant components following all safety and environmental requirements
  • Confirm your findings using reliable process. for instance replacing the faulty component and check if the symptoms still present
  • Compare the readings with repair manual
  • Analyse the symptoms and provide conclusion and document the process according to workplace requirement

4. After analysing provide repair recommendation by

  • Identifying the cause of fault for component failure or system failure
  • Provide various possible suggestions to resolve the issue and choose the best possible option after taking into account different variants such as time, cost and available resources. It should be done in compliance with regulatory requirement and Australian design rules.

5. After completing the work

  • Validate the work to meet workplace expectations.
  • Follow cleaning procedure including disposal of waste and non-recyclable material. and collection of recyclable material.
  • Check and store all electrical and mechanical tools and equipment upon completion of work in accordance with procedures to handle broken tools
Submission should include:

Introduction
Vehicle details
Confirm the fault (visual inspection/pre repair road test/ Freeze frame data)
Order of the task to be performed
List of required resource
Testing procedure of relevant component
Test result and comparison with specification
Conclusion/repair suggestion
Reason for component and/or system failure
Comments
Result

Assessment - 2

Student Instructions:

This is an open book written assessment. Make sure you answer all of the following questions.
• Read each question carefully and speak to your assessor if there is anything you are unsure of or don't understand.
• You will find some of the information in your course text books and may also need to conduct your own research on the internet.
• Ensure you note down any sources such as websites that you accessed to find the relevant information.
• Acknowledge clearly when and how you are drawing on the ideas or phrases of others.
• Read the Acumen Education Plagiarism Policy and Procedure carefully to understand the consequences that you could face if your work has been plagiarized.
• This task is to be completed in your own time, either at home or at Acumen Education. it you don't have internet access at home.
• Speak to your assessor if there is any reason you are unable to complete this task.
• Submit this assessment by the due date given to you by your assessor.1 List safety precautions while working on systems listed below.

2. List the work instructions to be followed below you proceed with the diagnosis of engine management system.

3. Write down diagnostic procedure for the problem given below.

4. Write down 3 common symptoms and diagnostic procedure for bad or tailing Engine control unit.

5. Explain the different types of ignition systems given below and how are they associated with engine management system?

6. Explain the functions, advantages and limitations of following diesel fuel injection system.
• Direct diesel injection system (DI)
• Common rail injection system (CRDI)

7. Briefly describe automotive gateway electronic control unit. What are the advantages and disadvantages of this unit?

8. Explain function, benefits and draw backs for the bus network topology.

9. How does the fuel system work with engine management system in modern light vehicles? What are its benefits and drawbacks?

10. How does electronic automatic transmission sensor output affect the engine performance?

11. How are the sensors and actuators integrated with automotive control computers? Give 2 examples with system chart. Also explain system chart with benefits and limitations.

12. Explain the below provided control signal circuits.
Example:
Wheel speed sensor output signal >>>>>EBD>>>>>Hydraulic Modulator

13. What is the difference between analog signal and digital signal? Give an example (Sensor) of analog and digital signal.

14. Describe the process of checking fuel injector signals by oscilloscope?

15. Explain testing procedure of below listed sensors by digital multimeter.

16. A vehicle's MIL fight stays on. How will a scan tool help to resolve this issue?

17. List diagnostic testing equipments required to analyse engine management system. Write down their functional difference and limitations.

18. Give one example for each of the scan tool diagnostic trouble code conditions given below:

19. How can you diagnose complex faults with the help of scan tool output features given below:

20. According to Australian design rules, mass and power output of the replacement engine should not be more than ____% greater than that of any engine offered by the original manufacturer for that model.

Reference no: EM132058327

Questions Cloud

What is sexual and asexual reproduction : What is sexual and asexual reproduction? Do chlamydomonas use both? Is that beneficial?
What is the project pi : A project has an initial cost of $62,825, expected net cash inflows of $8,000 per year for 6 years, and a cost of capital of 10%. What is the project's PI?
What is integrated pest management : An alternate method of pest control is the use of biological (living) agents to control pests. What is the greatest risk in the use of these controls?
Explain what the major transformations were : Explain how the 200 BCE to 500 CE period was a time of transformation for one of the following: Christianity, Buddhism, or Hinduism.
Analyse and evaluate electrical and electronic faults : AURETE001 - Analyse and evaluate electrical and electronic faults in engine management systems - WHS requirements including personal protection needs
What is the firm target debt-to-total capital ratio : What is the firm’s after-tax cost of debt? What is the firm’s target debt-to-total capital ratio? What is the weighted average cost of capital?
What are the steps of cellular respiration : What are the steps of cellular respiration and the energy released from a pear at each step?
Finding the project mirr using given data : A project has an initial cost of $43,425, expected net cash inflows of $10,000 per year for 6 years, and a cost of capital of 9%. What is the project's MIRR?
What types of bacteria are inhibited on macconkey agar : What types of bacteria are inhibited on MacConkey agar, and what type of contamination does this plate usually help to identify?

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  Package design

Package Design Brief: Assume you are the packaging engineer for a large consumer products company. In this company, the Packaging Design Briefs are initiated by the marketing group and forwarded to the Package Engineering group.

  Mechanical engineering questions

Define dynamic viscosity, Determine the centroid, Pressure due to the height of liquid, Advantage of changing the liquid, Calculate the total moment about the hinge of the seal gate.

  Automatic control

DOF system and Find the differential equation describing the system

  Write a paper on boyle''s law

Write a paper on Boyle's law and describe Compression and Combustion stroke . Also explain Charles's law and illustrate SI engine and CI engine.

  Verify the law for parallelogram of forces

To Verify the law for parallelogram of forces, law for triangle of forces and law of polygon of forces. These laws are very useful to calculate unknown forces in very short time.

  Discharge pressure of the compressor

What is the discharge revised discharge pressure of the compressor.

  The Case for Global Accounting Standards

The role of IFRS in both developing and developed capital markets.

  Wind turbine

Wind turbines are becoming more and more common as a method of energy production, wind turbines by their very nature are dynamic and are subject to and create their own internal and external kinematics and kinetics.

  Advanced design methodologies

8 x product engineering and design review (week 2 – 12), ~3 pages per item which must contain a brief description of the product then delve into concepts such as materials selection, manufacturing methods, life cycle analysis, recyclability and overa..

  Design of absorption column and the cooler

Design of absorption column and the cooler. Process design of other units should be completed along with pipe sizes.

  Determine the maximum total bending moment

Determine maximum total bending moment (static plus dynamic) of the beam under steady-state conditions.

  Force of the water on the gate

Determine the magnitude of the horizontal and vertical components of the force of the water on the gate.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd