Analyse and discuss differences between closing a project

Assignment Help Project Management
Reference no: EM13228905

Discussion Question, you should choose examples from your own experience or find appropriate cases on the Web that you can discuss. Credit will be given for references that you make to relevant examples from real companies. Please make sure that you cite and reference all of your outside sources properly, as per the Harvard Referencing System.

A project can be closed for several reasons. One reason is that the project has met its objectives; another reason could be that the project either failed to meet its objectives or is expected to fail. A third reason for closing a project could be that it is no longer aligned with corporate strategy. Analyse and discuss the differences between closing a project that has met its objectives and closing one that was terminated early. Look at both administrative closure and associated contract closure. Give reasons for stating the differences between the two scenarios.

Reference no: EM13228905

Questions Cloud

Is lynn a risk seeker or a risk avoider : Which route will minimize Lynn's expected travel time? Which route will maximize Lynns utility?When it comes to travel time, is Lynn a risk seeker or a risk avoider?
Is lynn a risk seeker or a risk avoider : (a) Which route will minimize Lynn's expected travel time? (b) Which route will maximize Lynn's utility? (c) When it comes to travel time, is Lynn a risk seeker or a risk avoider?
Explain the alpha fractions of the species of glutamic acid : Write simplified expressions in terms of [H+] and Kas and (with insignificant terms removed) for the alpha fractions of the following species of glutamic acid
What are some of the supply chian risk management tools : which ones, in your opinion, are the most difficult to overcome? 2. describe the major sources of supply base risk. what are some of the supply chian risk management tools available to avoid or mitigate supply chain risk?
Analyse and discuss differences between closing a project : Analyse and discuss the differences between closing a project that has met its objectives and closing one that was terminated early.
Evaluate the ka for the acid : Enough of a monoprotic acid is dissolved in water to produce a 0.0197 M solution. The PH of the resulting solution is 6.41. Calculate the Ka for the acid.
Explain the ammonia diffused from the soil : From the number if moles of ammonia calculated in part (a - below) determine the number of micrograms of mitrogen per gram of dry soil. Assum you have 2.753 f of soil and all of the ammonia diffused from the soil.
How to indicate that whether overflow occurs : A computer has a word length of 8 bits including sign. A= 10101011, B = 01101111 are 2's complement numbers. Perform the following operations and indicate whether overflow occurs: (2p) (a) A+B (2p) (b) A-B (2p) Give the decimal values of A and B
Compute the ph of the solution made by adding propanoic acid : Calculate the pH of the solution made by adding 0.50 mol of propanoic acid, (C2H5COOH or HC3H5O2) and 0.30 mol of sodium propanoate (C2H5COONa or NaC3H5CO2) to 1.00 L of water. The value of Ka for C2H5COOH is 1.3 x 10^-5.

Reviews

Write a Review

Project Management Questions & Answers

  Using the assembly-line balancing procedure

Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job

  Using the cut-and-try method for aggregate operations

Using the cut-and-try method for aggregate operations planning we can determine the production requirement in units of product. If the beginning inventory is 100 units

  Why have many u.s. states allowed casino gaming

Why have many U.S. states allowed casino gaming? Why is casino gaming controversial? Do you think casino gaming should be legalized? Explain the economic and social factors that would affect a state that has legalized casino gaming.

  Choice of an epistemological perspective or stance influence

In what ways does the choice of an epistemological perspective or stance influence the formulation of a management research problem?

  Compose a message informing the client of the poor ratings

Compose a message informing the client of the poor ratings and recommend a course of action

  Work breakdown structure differ from the project network

How does the Work Breakdown Structure differ from the Project Network (Diagram)?

  Computing total cost incurred

What will be the total cost incurred next year?

  Role of project manager in conjunction with project control

What is the importance of project management? Describe the role of the project manager in conjunction with project control.

  Protection measures affect the demand for unskilled labor

How might stringent job protection measures affect the demand for unskilled labor and the commentators think France should reduce its job protection rights. Job protection rights make it relatively difficult and expensive for French firms to fire w..

  Formulate this problem as a linear programming model

Formulate this problem as a linear programming model and solve it by using the computer.

  Describe the role of project manager

Describe the role of a project manager as an interface between business and technology professionals in an organization.

  Show the integrated project plan

Post the liquor license; validating IDs, validating the per-person limit, etc.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd