Reference no: EM132912762 , Length: word count:2500
Analyse and develop a change project plan
Description and requirements
Assessment 3 has three compulsory parts (numbered 1, 2, and 3). As a guide, your total word count should not exceed 2500 words. You have the discretionary control as to how this word count is best allocated.
1. Choose an organisation and research and develop a change project plan for a change initiative. The report must address all four requirements below.
A. Provide the organisation/entity context and introduce the change initiative.
B. Develop a change project plan. The plan should include:
a. Vision and purpose
b. Scope of the project
c. Key drivers
d. Broad goals and measures (e.g. Balanced Scorecard)
e. Actions and milestone (timeline)
f. Stakeholder analysis
g. Relevant attachments
C. Conclusion explaining and, through use of contemporary academic and professional sources, confirming the robust nature of the change plan and the benefits to the organisation.
NOTE: The change plan can be constructed for an organisation or part of an organisation (entity). This organisation can be known to the student, be identified through research (case study, online search, etc.) or be conceptual (created for the purposes of this work). If in doubt students should contact the unit coordinator to confirm the validity of the entity chosen for this assignment.
This is to be written as a report with the requirement that Part C to the question, as a minimum, include use of relevant academic references to support your plan.