Analyse and critically evaluate appropriate tools

Assignment Help Other Engineering
Reference no: EM132524412

ITECH7409 Software Testing - Federation University

Assignment - Software Test Document

The IEEE 829-2008 Standard prescribes a set of documents that cover the various stages of testing, including:

Master Test Plan (MTP): provides an overall test planning and test management document for multiple levels of test

Level Test Plan (LTP): provides for each level of testing, the scope, approach, resources, and schedule of the testing activities. It lists items being tested, the features to be tested, the tasks to be performed, the personnel responsible for each task, and the associated risk(s) need to be identified.
Level Test Design (LTD): details test cases and the expected results as well as test pass criteria. Level Test Case (LTC): specifies the test data for use in running the test cases identified in the Level Test Design.

Learning Outcomes Assessed

K1. Critically evaluate software requirements as inputs toward testing of the final solution

K2. Analyse and critically evaluate appropriate tools and techniques to support the testing process

K3. Develop a good understanding of selecting and applying measures and models used for testing that are compliant with the appropriate professional industry standards such as the ACS and IEEE

CRICOS Provider No. 00103D

K4. Critically reflect on the outcomes of software testing and propose strategies for improving quality and performance outcomes in the software process

S1. Analyse and critically evaluate software requirements and proposed solutions

S2. Apply complex decision making to select appropriate testing techniques

S3. Write professional level management, planning, quality assurance and testing documentation for a software system

S4. Apply effective testing techniques to software systems of varying scales and test levels

S5. Work in a team to evaluate and implement appropriate methods for determining quality and reliability in software systems

S6. Undertake quality assurance processes

A1. Develop and maintain plans for scheduling quality assurance tasks
including software testing

A2. Carry out the process of software testing and writing reports detailing
the results;

A3. Implementation of project management principles with respect to
software testing

Assessment Details

Commence your assignment task by reading the case study documents for the Online Backstage Management System (OBMS). The documents are:

• Software Requirements Specification (SRS)
• Software Architecture Design Document (SADD)
• Administrator documentation
• User documentation

Requirements:

Each group will need to submit a Software Test Document. The document will describe, in as much detail as possible, a full testing suite for the Online Backstage Management System.

The testing suite should include descriptions of the unit, integration and system testing levels and contain a detailed requirements traceability matrix.

To create the Software Test Document, groups should use the format shown in the sample Software Test Documentation shown in Lecture 5, slide 23, as this format incorporates features of

• master test plan
• level test plans for unit, integration and system testing levels that should relate to the requirements traceability matrix
• level test designs for unit, integration and system testing with details of the specific test data for each of the test cases

Note: It is not necessary to include Section 4 or Appendix A as suggested in slide 23, as it will not be possible to conduct testing of the Online Backstage Management System software in this assignment.

Attachment:- Software Testing.rar

Reference no: EM132524412

Questions Cloud

Bonds make semiannual payments : Parkway Void Co. issued 13-year bonds two years ago at a coupon rate of 10.3 percent. The bonds make semiannual payments.
Critically reflect on the outcomes of software testing : Critically reflect on the outcomes of software testing and propose strategies for improving quality and performance outcomes in the software process
What is the ytm : Parkway Void Co. issued 13-year bonds two years ago at a coupon rate of 10.3 percent. The bonds make semiannual payments.
Strategies for final implementation of new system : There are a number of strategies for final implementation of a new system. Identify your implementation strategy. Analyze each strategy based on your project.
Analyse and critically evaluate appropriate tools : Analyse and critically evaluate appropriate tools and techniques to support the testing process and Develop a good understanding of selecting and applying
Impressed with your ability to manage project : Your project sponsor has been impressed with your ability to manage this project. He has a project in mind for you when this project is over.
Share for a two-year comparative income statement : Present the earnings per share for a two-year comparative income statement that includes 2011 and 2010.
Specific artifacts from the mobile phone : What happens if you have a legal situation and you want to collect specific artifacts from the mobile phone i.e. an iPhone such as texts or SMS messages?
Find a bank that provides him with a more favorable sport : 1. think Logan will be able to find a bank that provides him with a more favorable sport rate than his local bank? Explain.

Reviews

Write a Review

Other Engineering Questions & Answers

  Write a matlab function entropy to compute the entropy

ME502 - Overview of Digital Communications - Melbourne Institute of technology - Evaluate multiuser communication and resource sharing techniques

  Identity first algebraically and then using truth tables

Prove each of the below Boolean identity first algebraically and then using truth tables.

  Correct chronological development of these tunnels

The correct chronological development of these tunnels - Emperor Claudius built the first Roman tunnel

  Find the thrust of the diffuser and nozzle

Determine the mass flow rate of air through the engine (lbm/s) and Complete the table with flow areas, static pressures, static temperatures, and velocities

  Analysis of systems with chemical reactions

This assignment focuses on the analysis of systems with chemical reactions. Be sure to follow the requirements for homework as posted to BB.Every problem should be well-documented with a brief problem statement (don't copy from this document, brie..

  Plot separate break-even graphs

Plot separate break-even graphs (Costs/Income -v- No of Products) for Machine A and Machine B. Which machine would you recommend for purchase? Why?

  CSCI910 Software Requirements Assignment

CSCI910 Software Requirements, Specifications and Formal Methods Assignment Help and Solution, University of Wollongong - Assessment Writing Service

  Write the multiple regression equation

Based on the data collected, Multiple regression was conducted of Salary increase on the two predictors namely Quality of work and experience

  Natural resourse managemnt the topic will be fresh water

the topic will be fresh water and i need the assignment to b highly proffesional.all the details attatched in

  Implementation of the digital pid controller

Can the controller tuning constants be changed while the controller is functioning without disturbing the manipulated variable?

  Calculate the angles that the normal vector of plane

Draw the Mohr diagram and show the point corresponding to each fault -Show graphically that your results are accurate enough.

  Discuss applying the safety and health management systems

Applying the Safety and Health Management Systems Approach to Workplace Ergonomics, Discuss the 10 generic countermeasure strategies proposed by Haddon

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd