An evaluation of the impact of the change

Assignment Help Management Theories
Reference no: EM13300815

In this project, you will analyse the situation and the effect of the change request on the schedule, cost, and features. The final project will be based on your answers for Week 4 (Project Proposal) and Week 6 (Project Outline). Your project deliverables will include:

*  A formal change request

*  An evaluation of the impact of the change (as submitted to the Change Control Board)-time and labour only

Note: It will be necessary to create the original project schedule and budget to analyse the impact of the change request. Consider that the additional wing will be built concurrently.

*  A list of all the assumptions made

*  An analysis of the risk factors due to the change request

*  A new project schedule that shows:

o  The additional time required for constructing the extra wing

o  The additional labour cost for constructing the extra wing

o  The new completion date

*  A statement of work for one contractor

*  A contract closure process description for one contractor

*  A project closure process description

The project details are as follows:

The Smiths purchase a piece of land and decide to build a house on it. They consult an architect and have blueprints created. You are a general contractor and agree to build the house for them.

You estimate it will take 12 weeks to complete the house. However, you need contingency time to accommodate the uncertain weather conditions, so you tell the Smiths you need 14 weeks. The Smiths are really anxious to move into their new house. So, although they agree for 14 weeks, they want to put in a late-completion penalty in the agreement. You agree, provided they also put in a bonus for early completion. You all sign the contract.

You estimate the project duration and effort as follows:

Task

Duration (days)

Effort (staff days)

Comments

Get a building permit.

5

1

 

Clear the site.

5

20

 

Dig the foundation and footings.

3

9

 

Install forms.

3

9

 

Pour concrete.

1

5

 

Wait for the concrete to harden.

5

0

This is referred to as lag time.

Remove forms.

1

3

 

Build the floor.

1

5

 

Frame the first floor.

2

10

 

Build the second floor.

2

10

 

Frame the second floor.

3

15

 

Sheath the house.

3

12

 

Install windows and doors.

4

8

 

Install siding.

2

6

 

Put up roof framing.

2

8

Can start as soon as the second floor is framed

Shingle the roof.

1

4

 

Install plumbing.

4

8

Can start as soon as the roof is shingled

Inspect the plumbing.

1

0

 

Install wiring.

6

12

Can start as soon as the roof is shingled

Inspect the wiring.

1

0

 

Hang and finish sheetrock.

4

12

Can start only after the plumbing and electrical work are inspected

Paint the interior.

3

9

 

Lay the carpet.

2

6

 

Install the hardwood flooring.

3

6

 

Install trim.

3

6

 

Procure the certificate of occupancy.

5

0

 

Total

75

184

 

Just as your crew starts framing the second floor, the Smiths tell you that they want an additional wing in the house. They give you a new set of blueprints containing the new wing and ask for a projected difference in price and time for the addition.

You determine that to add an extra wing, you would require the following in terms of duration and effort:

Task

Duration (days)

Effort (staff days)

Comments

Dig the foundation and footings.

2

6

 

Install forms.

2

6

 

Pour concrete.

1

3

 

Wait for the concrete to harden.

5

0

This is referred to as lag time.

Remove forms.

1

2

 

Build the floor.

1

4

 

Frame the first floor.

1

4

 

Build the second floor.

1

4

 

Frame the second floor.

2

8

 

Sheath the house.

2

6

 

Install windows and doors.

2

4

 

Install siding.

1

3

 

Put up roof framing.

2

6

 

Shingle the roof.

1

3

 

Install plumbing.

2

4

 

Inspect the plumbing.

     

Install wiring.

2

4

 

Inspect the wiring.

     

Hang and finish sheetrock.

2

6

 

Paint the interior.

1

3

 

Lay the carpet.

2

4

 

Install the hardwood flooring.

     

Install trim.

1

3

 
       

Total

34

83

 

This new estimate assumes the sheathing will go on the base house and then work will stop until the extra wing is sheathed. You believe this to be the most economical way to add the additional wing. Another option is to continue the project as originally planned and then to add the wing after the Smiths move in. After considering both options, the Smiths decide to follow your recommendation-to add the new wing before they move in. The additional work required is as follows:

Task

Duration (days)

Effort (staff days)

Comments

Procure the building permit.

5

1

 

Dig the foundation and footings.

2

6

 

Install forms.

2

6

 

Pour concrete.

1

3

 

Wait for the concrete to harden.

5

0

 

Remove forms.

1

2

 

Build the floor.

1.5

6

 

Frame the first floor.

1.5

6

 

Build the second floor.

1.5

6

 

Frame the second floor.

2

8

 

Add the sheath.

2

6

 

Install windows and doors.

2

4

 

Install the siding.

1

3

 

Put up roof framing.

2.5

7

 

Shingle the roof.

1

3

 

Install plumbing.

2

4

 

Inspect the plumbing.

1

0

 

Install wiring.

2

4

 

Inspect the wiring.

1

0

 

Hang and finish sheetrock.

2

6

 

Paint the interior.

1

3

 

Lay the carpet.

2

4

 

Install trim.

1

3

 
       

Total

38

90

 

The rates for the various trades (in $/hour) are as follows:

Code

Description

Rate

Comments

GC

General contractor

40.00

 

HE

Heavy-equipment operator

50.00

Includes equipment

C

Concrete worker

30.00

 

F

Framer

20.00

 

F

Siding installer

20.00

 

W

Window/door installer

30.00

 

R

Roofer

20.00

 

P

Painter

20.00

 

E

Electrician

35.00

 

FL

Flooring installer

20.00

 

T

Trim carpenter

35.00

 

PL

Plumber

35.00

 

 2500 words

Original work tested through turnitin

Graphs and tables using Microsoft project or open-project

3 references and more

Use citing and citation with Harvard system

If you need the project proposal and project outline from week 6 & 8 work let me know

 

 

 

Reference no: EM13300815

Questions Cloud

Explain the relative acid strengths of pairs of acids : Select all of the correct statements about the relative acid strengths of pairs of acids from the choices below. HCl is a stronger acid than H2S because Cl is more electronegative than S.
Determine another position vector that lies on the axis : A particle is located at the vector position r = (7.00i+ 10.00j)m, Determine another position vector that lies on the y-axis
Compare and contrast the weaknesses and the threats : Assuming that a organization is privately held, wants to expand operations, and is faced with three options for expansion: Going public through an IPO, Acquiring another organization in the same industry, Merging with another organization.
Threatening weather : Magritte’s painting “Threatening Weather” employs a basic Surrealist formula: juxtaposition of unrelated objects in an inappropriate setting. Explain how this painting balances sense and nonsense:
An evaluation of the impact of the change : An evaluation of the impact of the change
List the perceived deficiencies of the four not selected : Which two of the six methods used to evaluate projects, and to decide whether or not they should be accepted, do you prefer as a financial manager? Explain why you decided on these two and not the other four.
Determine the charge on plates before and after immersion : A parallel-plate capacitor in air has a plate separation of 1.35 cm and a plate area of 25.0 cm2. Determine the charge on the plates before and after immersion
Define weighted average cost of capital : Define Weighted Average Cost of Capital and explain why a company must earn at least its Weighted Average Cost of Capital on new investments. What are the financial implications if it does not?
What are the differences in the design models : What are the differences in the design models? Compare and contrast the standard airline organizational functional structure model with the hybrid structure based on independent business units. Does the hybrid structure provide too much differentiati..

Reviews

Write a Review

Management Theories Questions & Answers

  Learning in action

Learning contract proposal that will form the basis of your learning contract report.

  Change is the only constant

"Change is the only constant " Evaluate the different types of change that have occurred in Sony.

  How do advertisers try to use group influence

How do advertisers try to use group influence?  Will you find any specific examples and explain the relevant theory of group behavior and influence?

  Case study:saving sony

You have been appointed by Sony as a consultant on change management. Advise Sony on how they could implement the change by using the various theories of change you have learnt.

  How the stock market works

The purpose of this project is to help you to gain an understanding of how the stock market works and of the relationship between theory and practice.

  Find the optimal production quantities

Find not only the optimal production quantities, but also the optimal total cost.

  Describe the management process

Describe the management process and identify the skills required to manage business organizations.

  Case study : bert''s bonsai and aquatic sport museum

Case Study : Bert's Bonsai and Aquatic Sport Museum Prepare a knowledge management system.

  Knowledge management techniques

Demonstrate understanding of the many-sided nature of knowledge management

  Theory of transtheoretical model

Demonstrate understanding of the many-sided nature of knowledge management

  Write a paper on historical trends of management

Write a paper on Historical Trends of Management.

  Theory of reasoned action

Theory of Planned Behavior and Integrated Behaviors Model

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd