Reference no: EM13904444
Bullseye Stores, Inc. is a large retailer of household and grocery merchandise with 3900 stores in the United States and Canada. At one Bullseye store located in a major shopping complex in Charlotte there are 40 permanently-installed checkout lanes. Of course the Bullseye seldom opens all 40 lanes. However, they need much of this capacity to serve customers during the peak Christmas buying season.
During the Christmas season the Bullseye store in Charlotte extends its hours and is open from 6 AM to 12 AM 7 days a week. The store’s manager has evaluated daily store traffic between Black Friday and Christmas Eve for the past five years and has found the average number of buying patrons who enter the store varies through a normal day. The table below shows the average number of patrons entering the store per hour during four intervals in a normal weekday. These counts only include patrons who ultimately purchase something in the store and thus need to join a checkout line.
From Till Avg. Number of Buying Patrons
Entering the Store per Hour
6:00 AM 10:00 AM 300
10:00 AM 2:00 PM 425
2:00 PM 6:00 PM 350
6:00 PM 9:00 PM 550
9:00 PM 12:00 AM 225
The average transaction time at the checkout stand is 2 minutes and 45 seconds, which includes time to scan items, bag them, and payment with cash, card, Apple Pay, or Samsung Pay. Obviously there can be significant variation in this number from one patron to the next. Help Bullseye determine how many checkout stands to open during each block of time in their normal Christmas shopping week day. Keep in mind the following assumptions:
1. All checkout lanes are parallel single-server systems.
2. Balking, reneging, and switching behavior are minimal.
3. Customers have no preference on which open checkout lane to join.
4. Bullseye sets a minimal customer service target of having the average waiting time in the checkout queue be no longer than 4 minutes.
Considered when scheduling training
: Identify and describe the various components that must be considered when scheduling training.
|
Construct the control limits of the range chart
: A chocolate factory has weighed 4 chocolate truffles coming out of production over 5 working days to obtain the following data, weights are in grams. Group the data by day into five samples and find the sample average and range for each sample. Const..
|
What is web-based customer service and why is it important
: What is Web-based customer service and why is it important? What is a company's "culture?" What are some key characteristics of the culture at Yum! Brands, Southwest Airlines, and Zappos?
|
Cost cooperatively through waiting cost savings
: The wheat harvesting season in the American Midwest is short, and most farmers deliver their truckloads of wheat to a giant central storage bin within a two-week span. Because of this, wheat-filled trucks waiting to unload and return to the fields ha..
|
All checkout lanes are parallel single-server systems
: Bullseye Stores, Inc. is a large retailer of household and grocery merchandise with 3900 stores in the United States and Canada. At one Bullseye store located in a major shopping complex in Charlotte there are 40 permanently-installed checkout lanes...
|
Line of patrons waiting to enter Rambo Squirrel attraction
: RatLand is a large family theme park located in central Texas. Over the years a visit to Ratland has been institutionalized as a prime “have to” experience for children growing up in America. On a busy summer day how long on average will be the line..
|
Compare-contrast remote delivery methods
: Summarize computer based training, and compare/contrast remote delivery methods. Identify which method you prefer, and explain why.
|
Busy designing new lottery scratch-off games
: Louisiana is busy designing new lottery “scratch-off” games. In the latest game, Bayou Boondoggle, the player is instructed to scratch off one spot: A, B, or C. A can reveal “Loser, ” “Win $1,” or “Win $50.” B can reveal “Loser” or “Take a Second Cha..
|
Two companies are interested in purchasing the land
: Your company owns a large parcel of land in a neighboring city that you have no use anymore. Two companies are interested in purchasing the land. Company A has offered you $20,000 per year for 20 years for the land. Company B offers that in addition ..
|