AE7201 Wind Power Engineering Assignment

Assignment Help Other Engineering
Reference no: EM132428520

AE7201 - Wind Power Engineering - Kingston University London

Assignment: Tailored proposal for a wind farm

Learning Outcome:

Learning Outcome 1) select and use specific design and analytical techniques to make an optimum choice of wind turbine for use in a wind farm or where a small amount of local power generation is required

Learning Outcome 2) undertake individual wind power studies and projects and to contribute to many different aspects of major wind energy undertakings, from preliminary planning through to operation, maintenance and eventual decommissioning

Learning Outcome 3) Appreciate the impact of social, economic and environmental practices and energy policies on corporate social responsibility and business management.

Learning Outcome 4) formulate strategies for successful research within a variety of settings by selecting & utilising appropriate research methods

Learning Outcome 5) demonstrate an understanding of entrepreneurial engagement with entrepreneurial community and international business environment and assess their context (international, local or organisational) for the support and constraints it provides for entrepreneurial activities, and reflect on the implications.

Assignment Brief:

Design a wind farm on a site of your choice using Wind-Pro, e.g. near where you come from, and prepare a report setting out your design and seeking funding from equity investors.

Your proposal will need to convince your potential investors that:

1. Your wind farm area has an adequate wind regime and that you propose to site individual wind turbines favourably.

2. You will comply with local planning requirements regarding noise, visual amenity and other environmental impacts, which should be clearly stated.

3. The engineering performance of the wind turbines you propose to purchase, which should be clearly specified, and their reliability are adequate from the mechanical, electrical, civil, aerodynamic, and materials points of view.

4. Your proposed project management team is adequate and will be able to complete the construction in the time you have allowed, which should be clearly set out, bearing in mind any site access problems, including any improvements they will need to make.

5. Your project is fully costed, including any subsidies that are available, and will be profitable to your investors from the start, allowing for the repayment of any long-term loans.

You can expect your investors to submit your proposal to expert consultants in each of the five areas indicated for independent approval, so professional standards are expected on each of the topics listed.

Attachment:- Tailored proposal for a wind farm.rar

Verified Expert

he developed paper would reflect upon the integration and establishment of a wind-farm in Texas, USA. Additionally, it is important to note that the entire project simulation and establishment has been carried out through the use of WindPRO 3.3. Apart from the stated, additional data were collected from open sources

Reference no: EM132428520

Questions Cloud

Business environments of delta airlines : How are the individual environments working together for your chosen company? Is an environment causing limitations on another?
Construct an analysis of public administration : Construct an analysis of public administration at the present moment as it relates to the duties of the Executive, Legislative, and Judicial branches
How are cyberdeviant subcultures formed : How are cyberdeviant subcultures formed and sustained through time? How are members recruited, selected, and socialized by a cybercrime subculture?
Prospective payment or retrospective payment : Which do you believe is more effective as a financial plan: prospective payment or retrospective payment? What are the pros and cons of each?
AE7201 Wind Power Engineering Assignment : AE7201 Wind Power Engineering Assignment Help and Solution, Kingston University London - Assessment Writing Service - Tailored proposal for a wind farm
What is the role of minorities in elections : How do you compare the arguments in this article to the latest elections (2012)?Has the role of minorities in elections been changing? If so, how?
What is monetary policy : What is monetary policy? What is a bank holding company? What did the Riegle-Neal Interstate Banking Act do? Why was it passed into law?
Find the probability that the screws drawn : Find the probability that the screws drawn will be nondefective in drawing (a) with replacement, (b) without replacement.
Central component to analysis of new investment ideas : Cash flow projections are a central component to the analysis of new investment ideas.

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd