Reference no: EM1399967 , Length: 1700 Words
Huang is the son of successful Malaysian business people and works for his parents company. Huang owns a home in a suburb of Melbourne. The allotment of land upon which the house is built is quite large and Huang decides to construct a small factory and workshop at the rear of his property.
Huang has submitted a tender to a manufacturing company to make and assemble components for the company, and he intends to use the factory and workshop to house the machinery and equipment that he needs to use in this process. His tender has been accepted, and he needs to have the garage and workshop completed by 1st November if he is to meet the deadline for supply of the components for which he has submitted the tender.
Huang contacts Bill, a registered builder and discusses with Bill his requirements for the construction of the garage and workshop. He explains to Bill that he needs the buildings to be completed by 1s, November, but he does not tell Bill why that date is important to Huang. Bill assumes that Huang is going to use the factory and workshop for domestic and recreational purposes. He agrees to build the factory and workshop for Huang, and to complete the construction by 1st November.
Due to delays on the part of Bill, construction of the buildings is not completed until the following February, and Huang loses the contract for the supply of the components. The loss of the contract is directly due to the fact that Bill did not complete construction of the garage and workshop by ls: November as promised.
The delay in completion of the contract by Bill has therefore resulted in a loss to Huang of $150,000.
Huang now wishes to sue Bill for breach of his building contract and to claim from Bill the sum of $150,000 that he says has resulted from Bill's breach of the contract.
Advise Huang of his legal/contractual rights.
What is meant by total quality control
: What is meant by Total Quality Control? Japanese Way (1985) and (2) Guide to Quality Control (1976). Student will study this person's life and work to find out impacts that they have had in world.
|
Determining normal distribution-binomial distribution
: The records show that 8% of the items produced by a machine do not meet the specifications. Use the normal approximation to the binomial distribution to answer the following questions.
|
Confidence interval for the mean time spent
: Also, the sample data appear to have a bell-shaped distribution. Construct the 95% confidence interval for the mean time spent on paperwork by all managers.
|
How can humans benefit from stem cells
: There must be some major drawbacks t the widespread use of non-embryonic stem cells. What are those draw backs?
|
Advise huang of his legal - contractual rights
: Huang now wishes to sue Bill for breach of his building contract and to claim from Bill the sum of $150,000 that he says has resulted from Bill's breach of the contract and advise Huang of his legal/contractual rights.
|
Analysis of exponential probability distribution
: The time between arrivals of customers at the drive-up window of a bank follows an exponential probability distribution with a mean of 10 minutes.
|
Point flat-of-curve medicine
: Indicate at which point flat-of-curve medicine is experienced in the following example (imagine that antibiotics have been prescribed for a given population of 1,000 elderly persons).
|
Identifying potential qualified customers
: Following the seven steps in selling: Begin by listing the steps, then explain in your own words the meaning of each step. Create a scenario or example of how you would use all steps to complete a sale.
|
Sketch a typical batch culture growth curve
: sketch a typical batch culture growth curve as it would appear on semi-log paper and indicate a time of addition of each of these antibiotics and their effect on growth relative to the normal growth curve.
|