1. Describe the advantages of an integrated design approach for the delivery of high performance buildings, including how they can potentially reduce the initial costs of a "green" project.
2. A potential client wants to build an office building in the northern part of the United States (e.g., Southfield, Michigan), where cold winters and hot summers are common every year. The total site area can accommodate any shape and orientation of the building. The client is very interested in having the building certified by LEED, and the client is asking your advice on the matter of green building economics. The client is concern that the design and construction of the building will create additional costs that are not likely found in conventional buildings.
a. Briefly explain to the client what type of "extra" costs they will likely incur and why [note: limit the answer of this question to cost only. See next question to differentiate both answers]
b. (continues from previous question) what is the business case you would present to the owner to offset these costs? That is, what benefits the client will likely have by seeking LEED Certification? Would you propose any alternatives to the ultimate goal of the project?
Assume that you work for "Greenest-of-all," (GOA) a general contractor that is seeking to be involved in the construction of an office building. The owner is looking for a third party certification for the building (e.g., LEED) and you are brought to the project during the design phase. The owner hires "We-Check-It, LLC" (WCI) at the beginning of the design phase to be in charge of the commissioning process, which consist of all mechanical HVAC systems (do not consider commissioning of water systems or building envelope).
a. Describe how the inclusion of the Commissioning Authority (CxA) will likely affect GOA's scope of work and schedule in the project
b. How the commissioning process will affect the scope of work of the subcontractors? Would that affect the quote (price) of the subcontractors and the cost of GOA personnel?
c. Briefly describe the credits the commissioning process will likely affect in the certification of the building.
How might computerized communication be ineffective
: How might computerized communication be utilized to improve the effectiveness of communication in a bureaucratic organization? How might computerized communication be ineffective
|
What is a fluid
: Problem 1: What is a fluid? Give examples of both fluids and non-fluids. How do they differ?
|
Prepare all the necessary journal entries for sales
: Prepare all the necessary journal entries for 2010 sales, collections, and write-offs (using the direct write-off method). What is the net realizable value of accounts receivable in parts b(i) and b(ii)?
|
Explain about innovation in info technology
: Explain the three technologies that already i mentioned in milestone one and in which phase they are currently in adoption life cycle and what is the ideal time of adopting that technology.
|
Advantages of an integrated design approach
: 1. Describe the advantages of an integrated design approach for the delivery of high performance buildings, including how they can potentially reduce the initial costs of a "green" project.
|
Wheatstone bridge
: Problem 1: Consider the following Wheatstone bridge:
|
What is the new yield to maturity on the bond
: A year later, the bond price is $1,064. (Assume a face value of $1,000 and annual coupon payments.) What is the new yield to maturity on the bond?
|
What are the positive and negative consequences
: In addition, please describe what are the positive and negative consequences of having these rules, if any? This is very important. Often we don't realize that certain behaviors or attitudes we have, carry with them, either intended or unintende..
|
How much insurance coverage would insurance company require
: How much more insurance coverage would insurance company A require than insurance company B for full coinsurance coverage?
|