Reference no: EM13864309
Assume that manufacturing overhead for Glassman Company in the previous exercise consisted of the following activities and costs:
Setup (1,000 setup hours)..................................................$146,000
Production scheduling (400 batches).........................................60,000
Production engineering (60 change orders)....................................90,000
Supervision (2,000 direct labor hours) ........................................56,000
Machine maintenance (12,000 machine hours) .................................96,000
Total activity costs......................................................$460,000
The following additional data were provided for Job 845:
Direct materials costs................................................$8,000
Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours)...$1,000
Setup hours........................................................5 hours
Production scheduling ...............................................1 batch
Machine hours used (25 Milling machine hours;
5 Finishing machine hours) ..........................................30 hours
Production engineering...............................................3 change orders
Required
a. Calculate the cost per unit of activity driver for each activity cost category.
b. Calculate the cost of Job 845 using ABC to assign the overhead costs.
c. Calculate the cost of Job 845 using the plant wide overhead rate based on machine hours calculated in the previous exercise.
d. Calculate the cost of Job 845 using a machine hour departmental overhead rate for the Milling Department and a direct labor hour overhead rate for the Finishing Department
Maximize the selectivity for product
: The following sequences of reactions are to occur in a constant density reactor. Which type of continues flow-reactor would be best to maximize the selectivity for product C?
|
Compute the subgame perfect nash equilibriua in given game
: Compute the subgame perfect Nash equilibriua in the game below. Identify the path through the tree that each one represents, and the utilities of each player.
|
Percentage completion on profit-weighted-average method
: Gary Stevens and Mary James are production managers in the Consumer Electronics Division of General Electronics Company, which has several dozen plants scattered in locations throughout the world. What percentage completion would result in increasing..
|
Control of occupational hazards
: A specific hazard is identified for each workplace scenario. Identify one specific example of a control measure for each of the category of control strategy being asked
|
Activity driver for each activity cost category
: Calculate the cost per unit of activity driver for each activity cost category. Calculate the cost of Job 845 using ABC to assign the overhead costs. Calculate the cost of Job 845 using the plant wide overhead rate based on machine hours calculated i..
|
Forrest is given task of supervising their initial operation
: Forrest is the regional manager for a national chain of car rentals and is based in Washington, North Carolina. When the company opens new stores in Charlotte, Forrest is given the task of supervising their initial operation.
|
The balance in the finished goods inventory account
: Cerrone Inc. has provided the following data for the month of July. The balance in the Finished Goods inventory account at the beginning of the month was $53,200 and at the end of the month was $46,700. The cost of goods manufactured for the month wa..
|
What steps should be taken in hospitals
: How do health care providers, patients, and industries contribute to the development of drug resistant "bugs"? What steps should be taken in hospitals or health care facilities to prevent antimicrobial resistance? Provide specific examples
|
Respect to the accounting for bad debt expense