Moore Housing Contractors is negotiating a deal with Countryside Realtors to build six houses in a new development. Countryside wants Moore Contractors to start in late winter or early spring when the weather begins to moderate and build through the summer into the fall. The summer months are a busy time for the realty company, and it believes it can sell the houses almost as soon as they are ready-sometimes before. The houses all have similar floor plans and are of approximately equal size; only the exteriors are noticeably different. The completion time is so critical for Countryside Realtors that it is insisting a project management network accompany the contractor's bid for the job with an estimate of the completion time for a house. The realtor also needs to be able to plan its offerings and marketing for the summer. The realtor wants each house to be completed within 45 days after it is started. If a house is not completed within this time frame, the realtor wants to be able to charge the contractor a penalty. Mary and Sandy Moore, the president and vice president of Moore Housing Contractors, are concerned about the prospect of a penalty. They want to be confident they can meet the deadline for a house before entering into any agreement with a penalty involved. (If there is a reasonable likelihood they cannot finish a house within 45 days, they want to increase their bid to cover potential penalty charges.)
The Moores are experienced home builders, so it was not difficult for them to list the activities involved in building a house or to estimate activity times. However, they made their estimates conservatively and tended to increase their pessimistic estimates to compensate for the possibility of bad weather and variations in their workforce. Following is a list of the activities for building a house and the activity time estimates:
Time (days)
Activity Description Predecessor a m b
a Excavation, pour footers - 3 4  6
b Lay foundation a 2 3  5
c Frame and roof b 2 4  5
d Lay drain tiles b 1 2  4
e Sewer (floor) drains b 1 2  3
f Install insulation c 2 4  5
g Pour basement floor e 2 3  5
h Rough plumbing, pipes e 2 4  7
i Install windows f 1 3  4
j Rough electrical wiring f 1 2  4
k Install furnace, air conditioner c, g 3 5  8
l Exterior brickwork i 5 6 10
m Install plasterboard, mud, plaster j, h, k 6 8 12
n Roof shingles, flashing l 2 3  6
o Attach gutter, downspouts n 1 2  5
p Grading d, o 2 3  7
q Lay subflooring m 3 4  6
r Lay driveway, walks, landscape p 4 6 10
s Finish carpentry q 3 5 12
t Kitchen cabinetry, sink, and appliances q 2 4  8
u Bathroom cabinetry, fixtures q 2 3  6
v Painting (interior and exterior) t, u 4 6 10
w Finish wood floors, lay carpet v, s 2 5  8
x Final electrical, light fixtures v 1 3  4
1.
Develop a CPM/PERT network for Moore House Contractors and determine the probability that the contractors can complete a house within 45 days. Does it appear that the Moores might need to increase their bid to compensate for potential penalties?
2.
Indicate which project activities Moore Contractors should be particularly diligent to keep on schedule by making sure workers and materials are always available. Also indicate which activities the company might shift workers from as the need arises.

Reference no: EM13547738

Questions Cloud

How much more barium hydroxide requires to make a saturated : The solubility of barium hydroxide in water at 20 degrees Celsius is 1.85g/100 water. a solution is made up of 256 mg in 35.0 g of water. is the solution saturated. if not . how much more barium hydroxide needs to be added to make a saturated solu..
Include definitions, examples, real life reflection : Define and/or discuss the three term below. Each response must be at least 100 word but no more than 300 words. The response must be authentic, as it will be ran through a plagiarism check. I will ONLY pay $10 per response and the pay is not n..
Find the final speed of the object after the rope was pulled : An object of mass m is on a frictionless table rotating with a given tangential speed vo with a radius of string ri. Find the final speed of the object after the rope was pulled down the distance d
What is the present value today : If your discount rate is 8% compounded annually, what is the present value today of 4 years of college costs starting 18 years from today?
Activity description predecessor a m b : Activity Description Predecessor a m b
How many bottles should be ordered for the party : How many bottles should be ordered for the party and what will be the unit cost of the wine? The total cost?
Compute the amount of sulfuric acid in milligrams : A sulfuric acid solution is added to scale-forming water to convert calcium carbonate to calcium bicarbonate. Write the chemical equation for this reaction, and calculate the amount of sulfuric acid in milligrams per liter to neutralize 20 mg/l of..
Find how long does it take to reach the bottom of the ramp : A cylinder rolls down a ramp of height h = 1.1 m with ? = 36°, starting from rest at the top. How long does it take to reach the bottom of the ramp
Determine the depreciation rates per mile : Determine the depreciation rates per mile and the amount to be credited to the accumulated depreciation section of each of the subsidiary accounts for the miles operated during the current year.

Reviews

Write a Review

Operation Management Questions & Answers

  Calculate monthly penalty

A food processor uses approximately 29,470 glass jars a month for its fruit juice product. Because of storage limitations, a lot size of 4,000 jars has been used.

  Construct a process flow chart showing times

Construct a process flow chart showing times and all flows and how long does your process take after you have minimized the total time by doing as much concurrently as you can?

  Write down your personal and professional reasons for

post a 150- to 300-word response to the following discussion question what are your personal and professional reasons

  How the sales manager facilitates long term relationships

Based on your synthesis of information from the text and elsewhere, describe and discuss how the sales manager facilitates long term relationships with customers.

  What is a non-disclosure agreement

How are service levels established? Recommend why a negotiation strategy to achieve the performance level that was an industry standard versus a corporate standard would be in the best interest of both parties.

  How one company illustrates social responsibility

Create a research paper that discusses how one company (of your choice) illustrates social responsibility in its environment.

  What is the reliability of the process

Unrelated to part a. Goodstone Tire Company manufactures the "BX" Tire that has an expected life that is exponentially distributed with a mean of 35,000 miles. What is the probability that the tire will fail before 42,000 miles?

  Illustrate what leadership approach would you have taken

Depended on the Hersey-Blanchard theory, should Terrill have been less participative. Should he have initiated more task structure for the engineers. Illustrate what leadership approach would you have taken in this situation.

  Explain how mrp plays a role in this plan

Prepare a plan for Art Hill that gets the firm back on a course toward improved profitability. Be sure to identify the symptoms, the problems, and the specific changes you would implement.

  Mean abolute deviation and mean absolute percent error

Discuss the basic difference between the mean abolute deviation and mean absolute percent error

  Why quantitative risk so important in risk mitigation

Why is quantitative risk so important in risk mitigation? Explain how you have seen this in action in life or in your organization.

  Difference between consumer products and business products

Explain the difference between consumer products and business products. Why are some products difficult to categorize as one or the other?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd