Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
In the past, the Engine Enhancement division located at the Oakville plant has used a manufacturing support cost allocation rate based on machining hours. Recently, management has decided to pilot activity-based costing and has chosen its alternator production department for this project. The division produces three alternator models: Basic, Do-it-yourself (DIY) and Heavy Duty. The following information has been obtained from the company's records over the past year:
Basic
DIY
Heavy Duty
Total
Units produced
200,000
50,000
10,000
260,000
Direct material cost per unit
$40
$50
$60
Direct labour cost per hour
$30
Direct labour hours incurred
15,000
5,000
Inspections per unit
2
3
4
Machining hours per unit
.1
.2
.3
Batches packed and shipped
2,000
Manufacturing support costs of $2,705,000 were incurred last year as follows:
Inspections
$885,000
Machining
$1,650,000
Packing and shipping
$170,000
$2,705,000
Required
1. Determine the unit cost of each product using activity-based costing
2. Based on the results of the activity-based costing pilot, the selling price of the DIY alternator to Apexcustomers is currently about $3 per unit below total costs. The management team initially considered discontinuing production of the DIY alternator. The marketing manager indicated that the price of the DIY alternator could not be raised, as it is already somewhat higher than a major competitor's equivalent product. Using the information provided in part 1, what other actions might Apex consider to increase profitability of the DIY alternator? Provide at least four specific ideas.
Transform the equation to standard form and find the center and radius of the circle:
If BCD and EFGH are rectangles with AB=10cm,BC=7cm,EF=7cm and FG=4cm,all figures accurate to the nearest cm. Find (a)the largest and (b)the smallest possible values of the shaded area.
Determine 2 numbers such that the difference of its squares is 120 and the sum is 6. If I have 30 coins of two kinds 5 cents and 1 cent can I have a total of 78? A rectangle has a perimeter of 392 m calculate its dimensions if the length is 52 m long..
The hypothesized developmental differences
Will you be able to assist this evening? I will upload the questions around 9:00 p.m. central, and need them completed within the hour.
At the end of the year, the total interest from these investments was $940. How much was invested at each rate?
Draw the resultant vector and use trigonometry to find the magnitude and direction of the resultant force with respect to the x-axis.
Find the empirical probability that an iris bulb of this type will bloom. Give answer as a fraction in lowest terms.
State the null hypothesis and the alternative hypothesis that we would use for this test.
a 3kg mass with an initial velocity of 5.00i m/s collides with a sticks to 2.00 kg mass with a initial velocity of -3.00m/s find the final velocity of the composite mass.
Also Estimate the relative error in the calculated surface area.
Specifications for the computer upgrades are 78 minutes and 81 minutes. Estimate the percentage of process output that can be expected to fall within the specifications. (Round your answer to 1 decimal place. Omit the "%" sign in your response.)
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd