Acceptance sampling accepts or rejects an entire lot based

Assignment Help Finance Basics
Reference no: EM13519500

TRUE/FALSE 

1.A c-chart is appropriate to plot the number of flaws in a bolt of fabric. 

2.The x-bar chart, like the c-chart, is based on the exponential distribution. 

3.A process that is in statistical control will always yield products that meet their design specifications. 

4.The higher the process capability ratio, the greater the likelihood that process will be within design specifications. 

5.The Cpk index measures the difference between desired and actual dimensions of goods or services produced. 

6.Acceptance sampling accepts or rejects an entire lot based on the information contained in the sample. 

7.A lot that is accepted by acceptance sampling is free of defects. 

8.In acceptance sampling, a manager can reach the wrong conclusion if the sample is not representative of the population it was drawn from. 

9.The probability of rejecting a good lot is known as consumer's risk. 

10.An acceptance sampling plan must define "good lots" and "bad lots" and specify the risk level associated with each one. 

11.The acceptable quality level (AQL) is the average level of quality we are willing to accept. 

12.The steeper an OC curve, the better it discriminates between good and bad lots.

Reference no: EM13519500

Questions Cloud

Percent of the time the sample averages will fall inside : If a process has only natural variations, _________ percent of the time the sample averages will fall inside the ± 3σ  n (or ± 3σ x ) control limits.
What is the mean of the sampling distribution : Jars of pickles are sampled and weighed. Sample measures are plotted on control charts. The ideal weight should be precisely 11 oz. Which type of chart(s) would you recommend?
The statistical definition of six sigma allows : The statistical definition of Six Sigma allows for 3.4 defects per million. This is achieved by a Cpk index of
Regarding the average outgoing quality level : Which of the following statements about acceptance sampling is true
Acceptance sampling accepts or rejects an entire lot based : In acceptance sampling, a manager can reach the wrong conclusion if the sample is not representative of the population it was drawn from.
Averages of small samples not individual measurements : Mean charts and range charts complement one another, one detecting shifts in process average, the other detecting shifts in process dispersion.
Which of the types of auction would you recommend : If an auction house is selling products to risk neutral buyers, which of the types of auction would you recommend? If you are a potential buyer, what might your strategy be? Support your answers using economic analysis learned in this course.
The length of the snake vipera bertis : The length of the snake Vipera bertis (X), measured in centimeters, is assumed to be normally distrubuited with mean 63 and variance 22. The weight (Y) is measured on grams, can be calculated by using Y= -300 + 7x.
Compute the number of ways the first five numbers : Compute the number of ways the first five numbers can be selected.

Reviews

Write a Review

Finance Basics Questions & Answers

  What is the net present value of the project

The debt-equity ratio is .0.65 and the tax rate is 35 percent. What is the net present value of the project?

  What is the interest rate that the investor locked in

On January 8, 2016, a bank wants to lock in the 3-month interest rate starting on June 20, 2017. The investor buys June2017 Eurodollar futures contracts at 96.53. What is the interest rate that the investor locked in?

  Abc company stock has a required return of 12 and the

abc company stock has a required return of 12 and the stock sells for 40 per share. the firm just paid a dividend of

  Which scenario might prompt hamilton to bypass

Which scenario might prompt Hamilton to bypass a specific issue due to its rating?

  Capital structure-stephens security

Stephens Security has two financing alternatives: (1) A publicly placed $50 million bond issue. Which alternative has the lower cost (annual percentage yield)?

  Compute the covariance of return between the securities

An assignment has an expected cash flow of $300 in year 3. The risk free interest rate is 5%. The market risk premium is 8 percent. The projects Beta is 1.25. Compute the certainty equivalent cash flow for year 3.

  Why do us corporations build manufacturing plants abroad

why do u.s. corporations build manufacturing plants abroad when they can build them at

  Calculate the value of a right

Image Storage Corporation has #1,000,000 shares outstanding. It wishes to issue 500,000 new shares using rights issue. If the current stock price is $50 and the subscription price is $47/share, calculate the value of a right? a. 0.40/right b. 5.00..

  The greatest increase in the portfolio sharpe ratio

A portfolio's expected return is 12%, its standard deviation is 20% and the risk-free rate is 4%. Which of the following would make for the greatest increase in the portfolio's Sharpe ratio

  What is the immediate dilution effect for new stock issue

The Hamilton Corporation currently has 2 million shares of stock outstanding and will report earnings of $6,700,000 in the current year. The company is considering the issuance of 1 million additional shares that will net $37 per share to the corp..

  Stillwater hospital is borrowing 1000000 for its medical

stillwater hospital is borrowing 1000000 for its medical office building. the annual interest rate is 5 percent. what

  Differnce bewteen heavy lift surcharges and long lift

difference betweeen heavy lift surcharges and long lift surcharges. define heavy lift surcharge and long lift

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd