About the repair line control

Assignment Help Operation Management
Reference no: EM132099927

Repair Line Control

You have just been promoted from another department to become a supervisor of a repair line which has 6 employees. The purpose of the repair line is to visually inspect the entire unit, both exterior and interior doors, and make necessary repairs to any defect found. The unit is in the station for 120 seconds and the next unit comes into the station.

There are 4 employees, who have responsibility over a section of the unit, front driver side, front passenger side, rear driver side, and rear passenger side. A repair consists of sanding the spot with an air tool, polishing the spot with a different air tool, and using a wool pad air tool to remove the haze from the polish tool (the 3 step process). Any unit that cannot be repaired must go to major repair, which is a separate conveyor and takes approximately 30 minutes to repair, by a different team. After the repairs are made, the unit passes to a quality inspection station to be re-inspected by members of the quality department. A 5th team member repairs any defects found by quality.

The 6th employee is a team leader whose main responsibility is to ensure the line functions and achieves the quality and production targets on line. Any time a team member can’t finish the repairs in 120 seconds, the team leader finishes the unit and allows the team member to go to the next so they can begin the next sequence in time. The T/L also has other responsibilities such as setting up the line, giving extra breaks when necessary, reporting production quality and volume numbers each hour, responding to quality concerns from the quality station, and solving line issues.

The measureables on the line include:

23 out of 28 must pass to quality as “good” units.

No more than 4 minutes of downtime per hour is allowed to make production

CPU (concerns per unit) must be less than 2 per unit as inspected by quality.

5 units per hour must come out of major repair to make the 28 units required for production.

No defects are allowed on the final unit after quality inspection. 8 built units per day are audited for any defects on the entire unit.

Your boss is generally upset with the condition of the line. The repair line has to work overtime every day to keep up with the other departments. The cost to keep 6 repair line people and 4 major repair people for 30 extra minutes a day is getting out of control to budget. Additionally, the CPU is at 2.5, not making target, major repair is not delivering 5 units per hour, causing gaps to the quality station and losing production, there are too many defects found in the quality audit. Downtime is over 8 minutes per hour causing gaps to the quality station and losing production. Only 20 – 22 units per hour have appropriate quality to go to the quality station. In summary, none of the measureables for the line are being met.

As you watch the line you notice several things. There is a large variation in quality coming from the previous process. Some units have 2 defects, while others have 30 defects. The team has figured out that this fluctuation causes much of the downtime of the line because a few bad units per hour can’t be done in 120 seconds. To fix this, each team member will break from their individual routine and assist the other team member. The teamwork allows members with few defects to reallocate their low work levels and support the team member with the high work level and greatly reduce the downtime. Unfortunately this practice causes the helper to lose track of their process and miss parts of their inspection, which ends up in the quality audit occasionally. The manager has recognized that the defects can become greater than the line can handle, so a 7th or extra person has been assigned to the line, who acts as a rover and helps out wherever there appears to be a need. Even with the additional help, the line has the same results. The team leader and the supervisor are tied to the line and aside from posting the hourly measureables, they merely repair defects.

There are other factors which add to the chaos. Quality inspectors rotate weekly. Any time Edith is inspecting, the CPU goes from 2 to about 4, causing the overall average to be 2.5. Engineering is heavily involved with the area trying to come up with solutions. They have proposed a different set of materials and tools for the 3 step process. The new process is slightly faster, but leaves more haze, which is very noticeable on dark colored units. Half the team likes the new process, the other half like the old process. Currently, the line is set up to do either to give the team member the flexibility to use the process that works best for the individual.

An additional problem is the team members have recognized that if they do only the first 2 steps and skip the third step on either process, most of the time the repair passes quality, because it’s not noticeable on light colors. The team members will switch to the 2 step process in times where they are way behind in production, or there are a lot of incoming defects.

Management is also causing problems. The boss demands high quality and reprimands any employee who lets defects out of the station. During times when production is way behind, management will allow marginal units identified for major repair and reroute to quality inspection as a good unit. Most times the unit will go through quality and not be a concern, but there has been occasion where the unit was detected in the audit as bad and that same manager will reprimand an employee for letting the defect out of the line.

please give me the flowing:

Purpose (4 or 5 sentences)

Facts (list all the facts)

Analysis

Recommendation ( for all the problems)

Reference no: EM132099927

Questions Cloud

Research a project activity and propose the key actions : Speculate on why taking the first step of becoming an agile coach is a critical step for someone to effectively master agile project management.
What is a gantt chart : What is a Gantt chart? Describe and illustrate how a company can effectively incorporate it into its management of its production operation.
How would you summarize opportunity cost : Calculate the monthly payment and total interest paid on a car loan. In your own words, how would you summarize "opportunity cost"?
Variety of tools like expert opinion and consumer surveys : Assume that as a business manager, you have recently made good use of a variety of tools like Expert Opinion, Consumer Surveys,
About the repair line control : You have just been promoted from another department to become a supervisor of a repair line which has 6 employees.
What was the company net income or loss : A company began the accounting period with 50,000 in Owners capital, What was the company's net income or loss during the period
Leadership development program for entire organization : you have been asked to develop a leadership development program for the entire organization.
Failure of a formed clot to dissolve : Discuss the consequences of the failure of a formed clot to dissolve.
Review ackerman v. sobol family partnership case : Do you think that the Court was correct in holding that Attorney Glenn Coe had apparent authority to settle the case with the defendants?

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd