A schedule that is used to ensure accuracy in computing

Assignment Help Accounting Basics
Reference no: EM13602022

1. A schedule that is used to ensure accuracy in computing product costs is (are)
A) none of the schedules listed here.
B) the schedules of the cost of goods manufactured and cost of goods sold.
C) the schedule of the cost of goods sold.
D) the schedule of the cost of goods manufactured.
E) the schedule of raw materials used.

2. Using normal costing, which of the following is false about actual overhead?
A) All of these are correct.
B) It is reconciled at the end of a period with applied overhead.
C) Actual overhead is recorded to the overhead control account during the period.
D) It is separated into many smaller accounts, such as indirect labor, supplies, etc.
E) None of these.

3. Which of the following sentences is not true?
A) Actual overhead costs always enter the Work-in-Process account.
B) When a job is complete, it must leave Work-in-Process and be entered into Finished Goods or Cost of Goods Sold.
C) The cost of a job includes direct materials, direct labor, and applied overhead.
D) None of these are correct.
E) All of these are correct.

Reference no: EM13602022

Questions Cloud

A sampling of 240 students out of 1200 students were : a sampling of 240 students out of 1200 students were selected to study there average test scores. since the sample size
During the fishing opener the weight of a walleye caught : during the fishing opener the weight of a walleye caught was random. the weight of a walleye is uniformly distributed
If the us fleet of vehicles suddenly became 15 more fuel : if the u.s. fleet of vehicles suddenly became 15 more fuel efficient how much annual emissions of co2 would that
What is the expected return on an equally weighted : state of economy probability of state of economy rate of return if state occurs stock a stockb stockc boom 0.65 0.08
A schedule that is used to ensure accuracy in computing : 1. a schedule that is used to ensure accuracy in computing product costs is are a none of the schedules listed here. b
Question it takes 7769 days for jovian moon to circle : question it takes 7.769 days for jovian moon to circle jupiter. find the moons orbital speed if its obital distance is
A stack gas flowing at 80 m3min at t 25 degree c and 1 atm : a stack gas flowing at 80 m3min at t 25 degree c and 1 atm contains approximately 75 n2 5 o2 8 h2o and 12 co2. a
Question a small boat takes 3hr to o downstream from point : question a small boat takes 3hr to o downstream from point a to point b and 6hr to come back. how long will it take the
Determine the speed va and angle ua at which the ball was : it is observed that the time for the ball to strike the ground at b is 2.5 s. determine the speed va and angle ua at

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd