A new rural by-pass has been proposed for a small town, with three possible routes under consideration. Using the data in the table below and the procedures in WebTAG (see the link below), undertake an economic appraisal of the proposal, comparing its capital and recurrent costs with benefits deriving from:

(i) Travel time savings

(ii) Accident savings

(iii) Changes in Vehicle Operating Costs (VOC) and carbon emissions

Assumptions

  • Traffic levels and speeds remain constant over the appraisal period.
  • All vehicles cover the whole length of the road
  • The project life is 30 years
  • There areonly petrol carson this road
  • For Values of Time, use values for the 'average car'
  • Use 'link and junction' combined accident rates. (Don't subdivide accidents by severity).
  • Fuel costs vary over the project life as forecast by the central oil price scenario in WebTAG.
  • Use VOC values for the 'average car'
  • Base year for discounting is 2012 and the base test discount rate is 3.5%.
  • Use market prices at 2012 levels. Adjust for indirect tax where appropriate.
  • Assume maintenance costs etc. for the old road are the same whether or not the new road is built.

Make and justify all other assumptions as necessary.

1.Using MS Excel or similar, calculate the PVC, PVB, NPV, BCR, IRR and FYRR of the four options detailed on the attached data sheet.Summarise these in a report along with sufficient text and details of the calculations made to explain what you have done and why.State which option should be chosen based on these criteria, and give reasons for your choice. Note that you are dealing with a variable trip matrix and that you should use the rule of half to account for generated traffic.

 

2.To what extent might your results be affected by optimism bias and how should you adjust for this?

 

3.Outline the advantages and disadvantages of the main alternatives to cost benefit analysis

Note: Always indicate which section of WebTAG the procedures you are using come from.

Option 0: Do nothing- retain existing road

Option A: Build scheme A alongside retention of existing road

Option B: Build scheme B alongside retention of existing road

Option C: Build scheme C alongside retention of existing road

 

 

Option 0- Do nothing

Option A

Option B

Option C

Road Type

Older S2 A Road

Modern D2 Road

Modern D2 Road

Modern D2 Road

Road length (km)

6

10

8.5

12

Average speed on original road (km/hr)

22 (30 mph limit)

28 (30 mph limit)

28 (30 mph limit)

28 (30 mph limit)

Average speed on new road (km/hr)

n/a

65 (60 mph limit)

55 (60 mph limit)

65 (60 mph limit)

Traffic on original road (AADT)

16000

4000

6000

4500

Traffic on new road (AADT)

n/a

14000

12000

13500

Construction costs per km

n/a

£9m

£12m

£6m

Construction period (years)

n/a

2

2

2

Road management, maintenance etc. per km per annum

 

£10k

£10k

£10k

 

Sources and Some References:

 

Department for Transport (2011) The Transport Business Case.

https://www.dft.gov.uk/publications/transport-business-case/

Design Manual for Roads and Bridges (DMRB) Volume 13.www.standardsforhighways.co.uk/dmrb

Highways Agency Post Opening Project Evaluation (POPE) of Major Schemes

https://www.highways.gov.uk/roads/18386.aspx

Includes evaluation of a number of by passes.

WebTAG: Website for Transport Analysis Guidance

https://www.dft.gov.uk/webtag/

Adler, H.A (1987) Economic Appraisal of Transport Projects: A Manual with Case Studies. John Hopkins University Press.

Flyvbjerg, B., Bruzilius, N. and Rothengatter, W.(2003). Megaprojects and Risk. An Anatomy of Ambition. Cambridge University Press.

HM Treasury (2011) The Green Book. Appraisal and Evaluation in Central Government.https://www.hm-treasury.gov.uk/data_greenbook_index.htm

Rogers, M. (2001) Engineering Project Appraisal. Blackwell. Chapter 7 onwards

Snell, M. (1997) Cost-benefit Analysis for Engineers and Planners. Thomas Telford, London.

Willis, K., Garrod, G. and Harvey, D. (1998) A Review of Cost-Benefit Analysis as Applied to the Evaluation of New Road Proposals in the UK. Transportation Research D,3, 3, 141-156.

Reference no: EM13851005

Questions Cloud

Keynesian model-output exceeds aggregate expenditures : In the simple Keynesian model, if output exceeds aggregate expenditures, According to the Keynesian analysis, as income increases, the marginal propensity to consume will rise. In the classical model, a self-regulating market would. According to the ..
Find all the nash equilibrium in pure strategies : Bruce, Colleen, and David are all getting together at Bruce’s house on Friday evening to play their favorite game, Monopoly. They all love to eat sushi while they play. They all know from previous experience that two orders of sushi are just the righ..
Find the average cost per unit : This month your vendor invoiced $50,000 in testing charges for your production run. The unit cost for testing is twice as much for each of the first 500 units per month as compared to each unit over 500. If 750 units were shipped to the vendor this m..
Cmce 2415 elements of structural design - concrete : CMCE 2415 Elements of Structural Design - Concrete, Purpose: To apply techniques learned to the design of a rectangular reinforced concrete beam for moment.
A new rural by-pass has been proposed for a small town : A new rural by-pass has been proposed for a small town, with three possible routes under consideration. Using the data in the table below and the procedures in WebTAG (see the link below), undertake an economic appraisal of the proposal, comparing it..
This project concerns design of a one-story parking garage : This project concerns design of a one-story parking garage in a 90x120-foot land in a North Chicago suburb (Cook County).  Cars will be using both the ground level and the roof. The suggested design for the roof is a series of simply-supported girder..
Cae 432 project : This project concerns design of a one-story parking garage in a 90x120-foot land in a North Chicago suburb (Cook County).  Cars will be using both the ground level and the roof. The suggested design for the roof is a series of simply-supported girder..
What is the mean weight of my ancient gold coins : What is the mean weight of my ancient gold coins - How do you consider this collection, a population or a sample - However, some formats are better than others in the sense that they convey important and relevant information in the given data set.
Dataset that can be used with the between subject design : Create a new dataset that can be used with the between subject design. You will no longer need the variables CreativePre and CreativePost Test. Instead, you will have only one variable for the score on the creativity test.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd