A new rural by-pass has been proposed for a small town

Assignment Help Civil Engineering
Reference no: EM13851005

A new rural by-pass has been proposed for a small town, with three possible routes under consideration. Using the data in the table below and the procedures in WebTAG (see the link below), undertake an economic appraisal of the proposal, comparing its capital and recurrent costs with benefits deriving from:

(i) Travel time savings

(ii) Accident savings

(iii) Changes in Vehicle Operating Costs (VOC) and carbon emissions

Assumptions

  • Traffic levels and speeds remain constant over the appraisal period.
  • All vehicles cover the whole length of the road
  • The project life is 30 years
  • There areonly petrol carson this road
  • For Values of Time, use values for the 'average car'
  • Use 'link and junction' combined accident rates. (Don't subdivide accidents by severity).
  • Fuel costs vary over the project life as forecast by the central oil price scenario in WebTAG.
  • Use VOC values for the 'average car'
  • Base year for discounting is 2012 and the base test discount rate is 3.5%.
  • Use market prices at 2012 levels. Adjust for indirect tax where appropriate.
  • Assume maintenance costs etc. for the old road are the same whether or not the new road is built.

Make and justify all other assumptions as necessary.

1.Using MS Excel or similar, calculate the PVC, PVB, NPV, BCR, IRR and FYRR of the four options detailed on the attached data sheet.Summarise these in a report along with sufficient text and details of the calculations made to explain what you have done and why.State which option should be chosen based on these criteria, and give reasons for your choice. Note that you are dealing with a variable trip matrix and that you should use the rule of half to account for generated traffic.

 

2.To what extent might your results be affected by optimism bias and how should you adjust for this?

 

3.Outline the advantages and disadvantages of the main alternatives to cost benefit analysis

Note: Always indicate which section of WebTAG the procedures you are using come from.

Option 0: Do nothing- retain existing road

Option A: Build scheme A alongside retention of existing road

Option B: Build scheme B alongside retention of existing road

Option C: Build scheme C alongside retention of existing road

 

 

Option 0- Do nothing

Option A

Option B

Option C

Road Type

Older S2 A Road

Modern D2 Road

Modern D2 Road

Modern D2 Road

Road length (km)

6

10

8.5

12

Average speed on original road (km/hr)

22 (30 mph limit)

28 (30 mph limit)

28 (30 mph limit)

28 (30 mph limit)

Average speed on new road (km/hr)

n/a

65 (60 mph limit)

55 (60 mph limit)

65 (60 mph limit)

Traffic on original road (AADT)

16000

4000

6000

4500

Traffic on new road (AADT)

n/a

14000

12000

13500

Construction costs per km

n/a

£9m

£12m

£6m

Construction period (years)

n/a

2

2

2

Road management, maintenance etc. per km per annum

 

£10k

£10k

£10k

 

Sources and Some References:

 

Department for Transport (2011) The Transport Business Case.

https://www.dft.gov.uk/publications/transport-business-case/

Design Manual for Roads and Bridges (DMRB) Volume 13.www.standardsforhighways.co.uk/dmrb

Highways Agency Post Opening Project Evaluation (POPE) of Major Schemes

https://www.highways.gov.uk/roads/18386.aspx

Includes evaluation of a number of by passes.

WebTAG: Website for Transport Analysis Guidance

https://www.dft.gov.uk/webtag/

Adler, H.A (1987) Economic Appraisal of Transport Projects: A Manual with Case Studies. John Hopkins University Press.

Flyvbjerg, B., Bruzilius, N. and Rothengatter, W.(2003). Megaprojects and Risk. An Anatomy of Ambition. Cambridge University Press.

HM Treasury (2011) The Green Book. Appraisal and Evaluation in Central Government.https://www.hm-treasury.gov.uk/data_greenbook_index.htm

Rogers, M. (2001) Engineering Project Appraisal. Blackwell. Chapter 7 onwards

Snell, M. (1997) Cost-benefit Analysis for Engineers and Planners. Thomas Telford, London.

Willis, K., Garrod, G. and Harvey, D. (1998) A Review of Cost-Benefit Analysis as Applied to the Evaluation of New Road Proposals in the UK. Transportation Research D,3, 3, 141-156.

Reference no: EM13851005

Questions Cloud

Keynesian model-output exceeds aggregate expenditures : In the simple Keynesian model, if output exceeds aggregate expenditures, According to the Keynesian analysis, as income increases, the marginal propensity to consume will rise. In the classical model, a self-regulating market would. According to the ..
Find all the nash equilibrium in pure strategies : Bruce, Colleen, and David are all getting together at Bruce’s house on Friday evening to play their favorite game, Monopoly. They all love to eat sushi while they play. They all know from previous experience that two orders of sushi are just the righ..
Find the average cost per unit : This month your vendor invoiced $50,000 in testing charges for your production run. The unit cost for testing is twice as much for each of the first 500 units per month as compared to each unit over 500. If 750 units were shipped to the vendor this m..
Cmce 2415 elements of structural design - concrete : CMCE 2415 Elements of Structural Design - Concrete, Purpose: To apply techniques learned to the design of a rectangular reinforced concrete beam for moment.
A new rural by-pass has been proposed for a small town : A new rural by-pass has been proposed for a small town, with three possible routes under consideration. Using the data in the table below and the procedures in WebTAG (see the link below), undertake an economic appraisal of the proposal, comparing it..
This project concerns design of a one-story parking garage : This project concerns design of a one-story parking garage in a 90x120-foot land in a North Chicago suburb (Cook County).  Cars will be using both the ground level and the roof. The suggested design for the roof is a series of simply-supported girder..
Cae 432 project : This project concerns design of a one-story parking garage in a 90x120-foot land in a North Chicago suburb (Cook County).  Cars will be using both the ground level and the roof. The suggested design for the roof is a series of simply-supported girder..
What is the mean weight of my ancient gold coins : What is the mean weight of my ancient gold coins - How do you consider this collection, a population or a sample - However, some formats are better than others in the sense that they convey important and relevant information in the given data set.
Dataset that can be used with the between subject design : Create a new dataset that can be used with the between subject design. You will no longer need the variables CreativePre and CreativePost Test. Instead, you will have only one variable for the score on the creativity test.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Draw the influence line for the shear in panel cd of girnder

Draw the influence line for the shear in panel CD of the girder. Determine the maximum negative live shear in panel CD due to a uniform live load of 500 lb/ft action on the top beams.

  Compute andcompare its theoretical density

Molybdenum has a BCC crystal structure, an atomic radius of0.1363 nm, and an atomic weight of 95.94 g/mol. Compute andcompare its theoretical density with the experimental valuefound inside the cover.( experimental density is 10.22g/cm^3)

  How to draw the expected water table profile along the line

Compute the water table profile drawn in part B. Provide a detailed description of your methodology, and limit your solution to include only 4 image wells. Plot the profile, and provide drawdown amounts at X = -400 m, -200 m, -100 m, 100 m, 200 m,..

  Estimate the evaportranspiration losses for the area

Adriana wishes to accumulate $2,020,000 in 35 years. If 35 end-of-year deposits are made into an account that pays interest at a rate of 7% compounded annually, what size deposit is required each year to meet Adriana's stated objective?

  What torque is the engine producing at the vehicle speed

A 3400-lb car is traveling in third gear (ratio 2.5 to 1) on a level road at its top speed of 130 mi/h. The air density is 0.00206 slugs/cuft. The car has frontal area of 19.8 sqft, a drag coefficient of 0.28, a wheel radius of 12.6 inches, a driv..

  How to estimate the value of the fuel that is captured

Assume that the service station must fill refill the tank with 4.00 m^3 of gasoline once a week.Draw a mass balance diagram and estimate the annual loss of gasoline vapor (in kg/y) for the splash fill method

  Which option should to select to maximize the payout

You are the winner of a sweepstakes and given a choice of a one-time payment of $1,000,000 or a guaranteed $80,000 per year for 20 years. Assume that you will collect all 20 years regardless of health condition.

  What is the maximum diameter that the rod can have

Under the right conditions, it is possible, due to surface tension, to have metal objects float on water. Consider placing a short length of a small diameter steel (sp. wt. =460 lb/ft^3) rod on a surface of water.

  Total mass-quality of steam-specific volume

Find the total mass, quality of steam, specific volume, specific enthalpy, and specific internal energy.

  Determine what is the resultant thermal energy

The specific heat (C sub p) of aluminum is 0.214 calories per gram degrees Celsius (0.214 cal/g-C). If a cube of aluminum with a mass of 13.6 kg exhibits a change in temperature of +30 degrees Celsuis, what is the resultant thermal energy

  What is the minimum detention time in hours to settle

A rectangular sedimentation basin will have a flow of 1.0 mgd using a 2:1 legth/width ratio, and overflow rate of 0.00077 fps, and a detention time of 3.0 hr. What will the dimensions of the basin be?

  How would you have reacted to the arrival and actions of the

If you were a leader of an Asian power in this era like China, Japan, or India, how would you have reacted to the arrival and actions of the Europeans? Why?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd