A manufacturing plant runs three shifts with no breakdowns and plenty of raw materials. Over the past week, the plant has produced an average of 9 tons per day since the third shift has devoted much of their time to preventive maintenance. It is currently averaging a 75% utilization rate. What is the capacity of the plant?
A) 0 to 9 tons
B) 10 to 12 tons
C) 13 to 16 tons
D) 17 to 20 tons
Image text transcribed for accessibility: A manufacturing plant runs three shifts with no breakdowns and plenty of raw materials. Over the past week, the plant has produced an average of 9 tons per day since the third shift has devoted much of their time to preventive maintenance. It is currently averaging a 75% utilization rate. What is the capacity of the plant? A) 0 to 9 tons B) 10 to 12 tons C) 13 to 16 tons D) 17 to 20 tons
You are given the following forecasted information for the year 2016: sales=$300,000,000, Operating Profitability=6%, Capital Requirements=43%, growth=5%, and WACC=9.8%.
Assume that it takes Steve10 minutes to leave work and walk to LHS and 10 minutes to walk back (i.e. each way of the walk takes 10 minutes). How long (in minutes) will he need to leave work for to get a haircut at LHS?
Explain how long would you expect it to take to get a cup of coffee. Illustrate what is the probability that 3 or more people are in the cafeteria.
Elucidate what is the discovery process as it applies to a certificate action also Elucidate what role discovery plays in expediting civil legal proceedings.
When a patient is sent to another hospital, the hospital has to put a staff with adequate skills to guarantee the patient's life, which costs the hospital $200 per patient sent
A worker-machine operation was found to involve 3.6 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker's time averaged 2.5 minutes per cycle
Find out the cycle time also the appropriate number of workstations to produce the 40 units per day. Elucidate how would the target cycle time change if you required producing 50 units per day.
Illustrate what is number of orders per year if manager uses current order quantity of 1600. Also illustrate what is number of orders per year if manager uses Economic Order Quantity.
different standards for different products or services (e.g., 1.00, 1.20, 1.33 also 1.40). Elucidate what reasons might there be for using a single measure also Elucidate what reasons might there be for using multiple standards.
illustrate what is largest standard deviation in grams that machine that fills bar molds can have and still be considered capable if average fill is average fill is 340 grams.
What are some of the important steps in capacity management and why is this important to supply chain management
What are the weakest parts of the business plan? What are the strongest parts of the business plan? What areas need improvement?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd