A firm has redesigned its production process

Assignment Help Operation Management
Reference no: EM1386056

A firm has redesigned its production process so that it now takes 10 hours for a unit to be made. Using the old process, it took 15 hours to make a unit. If the process makes on unit each hour on average and each unit is worth $1,500, what is the reduction in work-in-process value?

Reference no: EM1386056

Questions Cloud

Issue of global warming and energy : Suppose you're a newspaper columnist asked to address the issue of global warming and energy in next editorial blog of your newspaper's website.
What is the probability-paid cash or check : Ms. Tina Stevens just purchased a new dress that cost $120. What is the probability she paid cash or check? (Round your answer to 3 decimal places.)
Diuretics produce less diuresis : Explain why do diuretics produce less diuresis than the loop diuretics and why would thiazide diuretic be chosen over the others for the treatment of hypertension?
Explain multiprogramming and time-sharing environment : Write down two such problems? Can we make sure same degree of security in time-shared machine as in dedicated machine?
A firm has redesigned its production process : A firm has redesigned its production process so that it now takes 10 hours for a unit to be made. Using the old process, it took 15 hours to make a unit
Weather and ground operations : Airlines monitor the causes of flights arriving late. 75% of flights are late because of weather, 35% of flights are late because of ground operations. 10% of flights are late because of weather and ground operations.
Miz of dntps and ddntps : During your PCR reaction, you realize that instead of using dNTPs, you used a miz of dNTPs and ddNTPs. Would you have more product, less product, or the same amount of product?
The electric generation capacity at one of its coal-fired : A large electric utility company has proposed building an $820 million combined cycle, gas-powered plant to replace the electric generation capacity at one of its coal-fired facilities.
Do students prefer a particular green : A survey of Ohio University students was conducted to determine if there was a particular Green that was desired by students to live on. A sample of students responses are reproduced below. Do students prefer a particular Green? Use critical value..

Reviews

Write a Review

Operation Management Questions & Answers

  Solve the cases

the stamping machines are expected to have 90 percent efficiency considering adjustments, changeover of patterns, and unavoidable downtime. How many stamping machines are required?

  What is the system utilization

A single bay car wash with a Poisson arrival rate and an exponential service time has cars arriving an average of 10 minutes apart, and an average service time of four minutes.

  Describe the concept of the change management process

Describe the concept of the change management process within a project. Provide two specific reasons why having a structured change management

  Which is considering expansion into china

which is considering expansion into China. The senior management of UA desires an analysis of the Chinese market from various perspectives, including trends and the impact of trends on business operations in the airline industry.

  Illustrate what is lack time for each individual activity

The activities, immediate predecessors also times appear in the accompany table. Illustrate what is lack time for each individual activity.

  The corporation has little experience with either set up

Because the corporation has little experience with either, set up like the other division sin a traditional hierarchy and production system, converting to total quality and JIT/ Lean little by little as time and experience permit

  A local distributor for a national tire company expects

a local distributor for a national tire company expects to sell 9600 radial tires of a certain size and tread design next year

  Illustrate what types of scheduling decisions is management

Illustrate what types of scheduling decisions is management likely to encounter in subsequent operations. Describe scheduling decisions in terms of types of resources to be scheduled also associated customers or jobs scheduled.

  Densepack company produces disk drives for mainframe

Densepack company produces disk drives for mainframe computers. The following information is given for optimizing their workforce level

  Illustrate what is the productivity

Illustrate what is the productivity. Illustrate what is the main assumption that requires holding true in order for these computed answers to be valid.

  Review all pending and threatened legal proceedings

Review all pending and threatened legal proceedings to which Kinder Morgan or any of its subsidiaries is a party. Describe the pricipal parties, allegations, and relief sought.

  Can a factory be fast-dependable also flexible produce

Can a factory be fast, dependable also flexible produce high quality product also still provide poor service from a consumer perspective.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd