A european distribution center site for american

Assignment Help Operation Management
Reference no: EM13689861

Selecting a European Distribution Center Site for American International Automotive Industries
American International Automotive Industries (AIAI) manufactures auto and truck engine, transmission, and chassis parts for manufacturers and repair companies in the United States, South America, Canada, Mexico, Asia, and Europe. The company transports to its foreign markets by container ships. To serve its customers in South America and Asia, AIAI has large warehouse/distribution centers. In Europe it ships into Hamburg and Gdansk, where it has contracted with independent distribution companies to deliver its products to customers throughout Europe. However, AIAI has been displeased with a recent history of late deliveries and rough handling of its products. For a time AIAI was not overly concerned since its European market wasn't too big and its European customers didn't complain. In addition, it had more pressing supply chain problems elsewhere. In the past five years, since trade barriers have fallen in Europe and Eastern European markets have opened up, its Europeans business has expanded, as has new competition, and its customers have become more demanding and quality conscious. As a result, AIAI has initiated the process to select a site for a new European warehouse/distribution center. Although it provides parts to a number of smaller truck and auto maintenance and service centers in Europe, it has seven major customers-auto and truck manufacturers-in Vienna, Leipzig, Budapest, Prague, Krakow, Munich, and Frankfurt. Its customers in Vienna and Budapest have adopted manufacturing processes requiring continuous replenishment of parts and materials.
AIAI's European headquarters is in Hamburg. The vice-president for construction and development in Dayton, Ohio, has asked the Hamburg office to do a preliminary site search based on location, geography, transportation, proximity to customers, and costs. The Hamburg office has identified five potential sites in Dresden, Lodz, Hamburg, Gdansk, and Frankfurt. The Hamburg office has forwarded information about each of these sites to corporate headquarters, including forecasts of the number of containers shipped annually to each customer as follows: Vienna, 160; Leipzig, 100; Budapest, 180; Prague, 210; Krakow, 90; Munich, 120; and Frankfurt, 50. When the vice-president of construction in Dayton received this information, he pulled out his map of Europe and began to study the sites.
Assist AIAI with its site selection process in Europe. Recommend a site form the five possibilities, and indicate what other location factors you might consider in the selection process.

Scenario: You are an independent consultant, hired by the Vice President of Construction, American International Automotive Industries (AIAI). Review Case Problem S7-1. Conduct an appropriate quantitative analysis and provide the vice president with a decision support paper addressing the issues within the Case Problem.

Specific guidance: You are expected to use the quantitative analysis methods within this module to arrive at conclusions and provide supported recommendations within your formal paper. You should select appropriate graphical presentation methodologies to present this material within the paper. Include all computation materials as appendices to the completed report.

Reference no: EM13689861

Questions Cloud

Find the curvature radius for alpha particles trajectory : An alpha particle and ?? particle, each with kinetic energy 35keV, are sent through a 1.1T magnetic field. Find the curvature radius for alpha particle's trajectory
How much tensile stress is required to stretch : The Achilles tendon, which connects the calf muscles to the heel, is the thickest and strongest tendon in the body. How much tensile stress is required to stretch this muscle by 5.4% of its length
How much work against gravity does mike do : Mike lifts a 15 kg cubical crate from the floor if his apt until it is flat against the ceiling. How much work against gravity does Mike do in lifting the crate
How fast must you travel : Suppose you are planning a trip in which a spacecraft is to travel at a constant velocity for exactly seven months, as measured by a clock on board the spacecraft, and then return home at the same speed. how fast must you travel
A european distribution center site for american : A European Distribution Center Site for American
What is the final speed : A steel playground slide is 4.58m long and is raised 2.35 m on one end. What is the final speed if a child of mass of 22.8 kg as she slides down from the top starting at rest
What is the final speed of the glass : A 409 g glass rolls down an incline and onto a horizontal platform where it hits a beverage can that is laying at rest on its side. What is the final speed of the glass
What is the uncertainty in the balls horizontal momentum : What is the uncertainty in the ball's horizontal momentum in a direction perpendicular to that in which it is being thrown if the student throwing the ball knows that it is located within a cube with volume 1000cm3 at the time she throws it
What is the wavelength of the incident photon : An incident x-ray photon is scattered from a free electron that is initially at rest. What is the wavelength of the incident photon

Reviews

Write a Review

Operation Management Questions & Answers

  How many people should be sent to contain the fire

Develop a model for determining how many people should be sent to contain the fire and for determining the best location for the firebreak (draw a picture first).

  Discuss the value of marketing to the consumer

Discuss the value of marketing to the consumer, the stakeholder and stockholder. Address the following: a. the value you place on marketing b. the value of marketing to customers and consumers c. the value of marketing to stakeholders and stockhol..

  Which coca-cola products are most likely to lose customers

They warn that products like coke zerowill cannibalize lost market share from other soft drink categories instead of increasing the number of consumers overall .Which coca-cola products are most likely to lose customers to coke-Zero?

  What are the maximum and minimum cycle times

The line will operate for 480 minutes per day. a. What are the maximum and minimum cycle times? b. What output rate will be achieved by each of those cycle times?

  Calculate the expected return

Calculate the return (in Percent) for each value of b. (note: you may just calculate the totaal return and not worry about how this split between current yield and capital- gains yield)

  How is activity of listening impact by particular situation

How is the activity of listening impacted by the particular situation?

  Critical path of your project

Analyze the critical path of your project, and discuss the total float in the project. Next, suggest the primary measures that you would use in order to manage the critical path and reduce the float in the project.

  Compute the amount of annual contributions

Stressed and penniless after months of day trading, Mr. Baruch decides to invest his savings into a conservative growth mutual fund.

  Why do not more small companies in the united states adopt

For what contributions to the quality movement is Philip B. Crosby known?

  Explain how to negotiate for more compensation

Describe how to negotiate for more compensation. Explain why one must be assertive to earn what he or she deserves. Relate four things not to do when asking for a raise.

  Prepare an implementation plan for change

Prepare an implementation plan for change that would enable Gar Finnvold to create a fully competitive computer service within two years. Review the list of possible interventions below as you develop an implementation plan for NCO.

  The corporation has little experience with either set up

Because the corporation has little experience with either, set up like the other division sin a traditional hierarchy and production system, converting to total quality and JIT/ Lean little by little as time and experience permit

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd